Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />; <br /> <br />DRAFT <br /> <br />DRAFT <br /> <br />DRAFT <br /> <br />DRAFT <br /> <br />NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY <br />Regular Meeting Minutes <br />September 7, 2000 <br /> <br />The Northstar Corridor Development Authority met in regular session on September 7, 2000, in the Board Room at the <br />Sherburne County Government Center, Elk River, Minnesota. <br /> <br />Present were: Bob Erdrick, Tom Wenzel, Tim Houle, Tim Yantos, Betsy Wergin, Mary Richardson, Mark <br />Stenglein, Paul Ostrow, Steve Billings, Lewis Stark, Don Jolly, Jim Dickinson, Duane Cekalla, Carl Yilek, <br />Gerald Goebel, Jerry Leese, Duane Grandy, Bob Johnson, John Ellenbecker, Terry Nagorski, Stephanie <br />Klinzing, Alicia Vap, Dean Michalko, Jeanne Witzig, Rick Speak, Luci Botzek, Sue Siemers, Jim McLean, <br />Kelli Neu, Scott Harlicker, Robert Kirchner, Mark Koegler, Ray Friedl, Vic Oviatt, Peggy Aho, Brian <br />Bensen, Lynn George, David Loch, Gabe Guevara, Mukutar Thakur, Mike Christensen, Jeff Dehler, Ken <br />Stevens, Jan Lucke <br /> <br />1. The meeting was called to order at 4:35 p.m. <br /> <br />2. Mr. Mukhtar Thakur, Director of Passenger Rail Operations with MnDOT was introduced. Mr. <br />Thakur will be representing MnDOT on the NCDA project. <br /> <br />3. <br /> <br />A motion was made by Stephanie Klinzing, seconded by Terry Nagorski and carried unanimously to <br />approve the agenda of September 7,2000, and the minutes of the August 3,2000 meeting, as <br />presented. <br /> <br />4. Executive Committee Report: <br /> <br />a) Discussion was held on the selection of a preliminary engineering firm for design of <br />commuter rail stations, maintenance facility, communications and control center, layover <br />facilities and related track work. The Executive Committee prepared and advertised an RFP <br />indicating the contract dates are September 7, 2000 through March 31, 2001, in an amount <br />not to exceed $1,000,000 with proposals due on August 11, 2000. Two firms responded: <br />URS/BRW and TKDA. The firms were interviewed by the proposal team on August 28, <br />2000. Based on the interviews, the Executive Committee is recommending that the NCDA <br />approve awarding the preliminary engineering contract to URS/BRW because of their: <br />allocation of project costs; flexibility; recognition of importance of the Project Management <br />Plan; references; project understanding and willingness to meet contract terms and insurance <br />requirements. <br /> <br />A motion was made by Mark Stenglein, seconded by Duane Grandy, and carried <br />unanimously to approve the recommendation of the Executive Committee to award the <br />preliminary engineering contract to URS/BRW for the design of commuter rail stations, <br />maintenance facility, communications and control center, layover facilities and related track <br />work, for services not to exceed $1,000,000 with a term of September 7, 2000 through <br />March 31, 2001, with the following additions as recommended by the Executive Committee: <br /> <br />That the URS/BRW / NCDA contract have a clause providing for penalties <br />for late deIiverables. <br /> <br />Page 1 <br />