My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 12-05-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
12-05-2016
>
8.1. SR 12-05-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2016 8:48:21 AM
Creation date
12/1/2016 2:40:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ћ͵ЋWƚƦƌźƓ{ƷƩĻĻƷ <br />JoplinStreetisacollectorroadwhichconnectsseveralresidences,businessesandciviccenters <br />withTrunkHighway10.ThedeteriorationofthepavementfromTrunkHighway10toMississippi <br />RoadNWismoreseverethanfromMississippiRoadtoRiverviewDrive.Therefore,afulldepth <br />reclamationisproposedtorehabilitatethissegment.Theexistingbituminouspavementwillbe <br />reclaimedintotheunderlyingaggregatebase.Allfailedsectionsofconcretecurbandgutterwill <br />bereplaced.Thenewbituminoussurfacewillbeconstructedandthepavementmarkingswillbe <br />reapplied.ThebituminoustrailalongtheeastsideofJoplinStreetwillalsoberehabilitatedand <br />nonADAcompliantpedestriancurbrampswillbereplacedalongthissegment. <br />SouthofMississippiRoad,theedgeofthebituminouspavementwillbemilledalongtheconcrete <br />curbandgutter.Abituminousoverlaywillthenbeconstructedtoaddstrengthandextendthe <br />lifeofthepavementsurface.Thenewoverlaywillmatchtheexistingcurbelevations. <br />ThetotalcostfortheimprovementstoJoplinstreetis$635,799.Thelimitsoftheprojectare <br />depictedbelowinFigure3. <br />CźŭǒƩĻЌ <br />WƚƦƌźƓ{ƷƩĻĻƷ <br />CityofElkRiver,Minnesota 4|Page <br />2017StreetandUtilityImprovements <br />
The URL can be used to link to this page
Your browser does not support the video tag.