Laserfiche WebLink
2.3 Orono Parkway <br />The pavement on Orono Parkway is showing signs of deterioration and has surpassed its useful <br />life. The existing pavement is raveling and has several surface defects. The concrete curb and <br />gutter of the center median collects the stormwater runoff and conveys it to a low point in the <br />median where the stormwater is then directed across the driving lanes. The pavement at these <br />areas is showing greater signs of distress from the concentrated flow and further is a safety <br />concern due to possible hydroplaning and ice formation during the winter months. <br />The proposed rehabilitation method is a full depth reclamation. All failed segments of the <br />concrete curb and gutter will be replaced. Further, storm sewer will be added at strategic <br />locations in the center median to safely convey the stormwater to the storm drainage system. <br />The new bituminous surface will be constructed and pavement markings will be reapplied. The <br />bituminous trail on the north side of Orono Parkway will also be rehabilitated and non ADA <br />compliant pedestrian curb ramps will be replaced. The total estimated cost for Orono Parkway <br />is $533,940. The limits of the proposed project are shown below in Figure 4. <br />Figure 4 <br />Orono Parkway <br />City of Elk River, Minnesota 5 | Page <br />2017 Street and Utility Improvements <br />