My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 PCSR 11-22-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
11-22-2016
>
5.5 PCSR 11-22-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 8:46:24 AM
Creation date
11/18/2016 9:08:08 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/22/2016
case
CU 16-28
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Stalls: <br />Stalls existing at 11044 Industrial Circle NW, that will be available to Spectrum High School once the remainder of the <br />condominiums are purchased = 48 Stalls <br />(Proposed) Stalls in the Newly Proposed Parking Lot = Approximately 120 Stalls <br />Total Additional Parking Stalls = Approximately 168 Stalls <br />Total stalls available to Spectrum High School upon completion of the proposed project: Approximately 396 Stalls <br />Is There Proposed Screening of the Site? <br />Screening already exists for the current building at 11044 Industrial Circle NW. <br />The field house will be located on the interior of the current building. No additional screening is currently being proposed. <br />Proposed Building Materials: <br />11044 Industrial Circle NW is currently constructed. Interior buildout will be steel stud, sheetrock, and cement <br />construction, similar to current 61" grade building construction. <br />The field house will be a steel building. Interior buildout will be steel stud, sheetrock, and cement construction. <br />How do they comply with applicable design standards? <br />Rivera Architects, Inc. will ensure compliance with all applicable design standards. <br />Signage <br />Spectrum is currently considering two additional signs. <br />The first will be located at the northeast corner of the current structure located at 11044 Industrial Circle NW. The size of <br />the sign will be approximately 12 feet wide by 6 feet high. <br />The second sign will be located on the west side of the proposed field house and will be approximately 36 feet (wide) by 3 <br />feet (high). <br />Both signs will be illuminated. They will be of aluminum and vinyl construction. <br />Is There Outdoor Storage? <br />No outdoor storage is currently being planned for this site. <br />Spectrum is honored to serve students and families of the Elk River community. We value the relationships built with <br />local businesses and the connections our students have made through their ongoing service learning. We are enthusiastic <br />about growing the school and continuing to provide this educational choice to students and families of the Elk River <br />community. <br />We look forward to the working with the City on the proposed expansion project for Spectrum High School. <br />Sinc <br />Rick Peterson <br />Director of Athletics and Facilities <br />Spectrum High School <br />
The URL can be used to link to this page
Your browser does not support the video tag.