Laserfiche WebLink
CUP Narrative — September 26, 2016 <br />Submitted by: Spectrum High School <br />Background <br />Spectrum High School (Spectrum) is a 6"' through 12"' grade public charter school celebrating its 10' year serving the <br />students and families of Elk River. <br />Spectrum's vision is to be a leader in fostering academic and personal excellence through programs emphasizing high <br />academic standards in a small -school setting. The school accomplishes this by emphasizing college preparatory <br />curriculum, a technology integrated environment, and community-based outreach. <br />The school began operations in 2006, serving 66 students at the Boys and Girls Club located at 905 6th St NW. In 2007, <br />Spectrum moved to modular classroom units located at 10129 181 S` Avenue — the current location of our Athletic <br />Complex. Spectrum continued growing, leading to expanded operations serving 390 students in 2011 at our current high <br />school location, 17796 Industrial Circle NW. In 2014, Spectrum moved its 6" grade students to 11044 Industrial Circle <br />NW, across the street from the high school building. For the past two years Spectrum has been serving over 600 students <br />in grades 6-12 between our two facilities, while employing approximately 145 people. <br />Due to the continued success of Spectrum students and programs, the school is in need of additional facility space. The <br />following proposed project anticipates future growth through 2022, reaching a capacity of up to 1,000 students. <br />Detailed Description of Project <br />1. Spectrum Building Company (SBC) to purchase the remaining 12 condominium units (units 1 10-121). There are <br />two owners of these units, which cover approximately 28,552 Sq. Ft. and are located at 11044 Industrial Circle. <br />SBC would then own the entire building, which would be converted to a 6t" through 81" grade facility over three <br />years. The 6`" grade building currently occupies condominium units 100-109. <br />2. SBC to purchase the adjacent property, located on the southwest corner of 17823 Industrial Circle NW across <br />from the current high school facility, to be used for a parking lot. This lot is currently attached to the parcel at <br />17823 Industrial Circle NW. SBC would then request the lot be attached to the parcel located at 11044 Industrial <br />Circle, creating one new parcel. <br />3. Build a field house in the current interior parking lot of 11044 Industrial Circle NW for needed year-round <br />physical education and extra -curricular activities, and possible community use. <br />4. Convert a portion of the high school facility to a College and Career Center, continuing to expand concurrent <br />enrollment opportunities for students. <br />Timeline for Project <br />Spectrum anticipates acquisition of the building, located at 11044 Industrial Circle NW, and the open lot, located on the <br />southwest corner of 17823 Industrial Circle NW, early in 2017. The 7"' grade space (four condominium units directly <br />connected to the current 6"' grade building) would then be constructed in preparation for the 2017-2018 school year. <br />Construction on the 8t" grade space (including a performing arts center) at 11044 Industrial Circle NW, the parking lot, the <br />field house, and the College and Career Center would begin early in 2018 in preparation for the 2018-2019 school year. <br />Hours of Operation <br />Weekdays: (Staff) 7:30 a.m. — 4:30 p.m. (Students) 7:30 — 3:15 p.m. <br />After School and Evening Activities: Hours vary between all school events and extracurricular activities <br />Weekend Activities: Hours vary between all school events and extracurricular activities <br />Number of Employees: <br />Spectrum High School currently employees approximately 140 people <br />With the full expansion, it is anticipated that the school will employee an additional 20 to 50 people <br />Number of Parking Stalls (existing and additional): <br />Existing (currently available to Spectrum High School): <br />High School Building = 130 Stalls <br />6" Grade Building = 98 Stalls <br />Total Existing Stalls = 228 Stalls <br />