My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 PCSR 11-22-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
11-22-2016
>
5.5 PCSR 11-22-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 8:46:24 AM
Creation date
11/18/2016 9:08:08 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/22/2016
case
CU 16-28
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. Dill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. <br />The project does not include exterior development that would result in the loss or damage of <br />natural or historic features. The area is fully developed, and exterior impacts are localized to areas <br />already covered by impervious surfaces. <br />7. Dill fully comply avith all other requirements of this Code, including any applicable requirements and standards for <br />the issuance of a license orpermit to establish and operate the proposed use in the city. <br />The project meets all other standards described in the city code. <br />If denial of such a permit should occur, it shall accompany recommendations or determinations by <br />findings or a report stating how the proposed use does not comply with the standards set forth in Section <br />30-654. <br />In the review of the standards for CUP as outlined, it appears that the request is consistent with all of <br />these standards. <br />The applicant has also supplied a narrative describing the projects fit within the CUP standards. <br />Financial Impact <br />None <br />Statutory Review Period <br />Per State Statute 15.99 the required 60 day review period was extended to January 24, 2017. <br />City Council <br />If acted on, this item will be reviewed by the City Council on December 19, 2016. <br />Attachments <br />■ Location Map <br />■ Applicants Narrative dated September 26, 2016 <br />■ Floor plans received November 16, 2016 <br />■ CUP Conditions Narrative dated November 16, 2016 <br />N:\Departments\Community Development\Planning\Case Files\CUP\CU 16-28 Spectrum High School\ 3- Planning Commission\CU 16-28 sr PC <br />11-22-2016.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.