Poor work performance on the job site and the demonstrated inability to rectify poor <br />workmanship <br />Contractor is causing undue damages to the property and showing an inability or <br />unwillingness to correct the damages. The cost of repairing damages will be deducted <br />from any money owed the contractor for work already completed <br />Where collusion or fraud has been determined to exist on the part of the contractor <br />Lack of sufficient insurance coverage <br />Inability of the contractor to perform the work within the allotted time <br />Irreconcilable and irresolvable differences between the contractor and the owner <br />The cost of repairing poor workmanship and the higher costs of awarding the bid to another <br />bidding contractor shall be deducted from any amount owed to the initial contractor for work <br />completed. In all cases, the contractor shall be given the opportunity to rectify the problem <br />before contract cancellation procedures are instituted. CMHP shall adhere to the following <br />procedures when negotiating a workmanship problem: <br />A meeting will be scheduled at the job site with the contractor and homeowner to <br />attempt to come to a consensus about the problem and solution <br />If problem persists, CMHP shall contact the contractor by certified mail notifying the <br />contractor that the workmanship is still poor and specifying areas that need to be <br />addressed to satisfy the contract. The letter will give the contractor fifteen (15) days <br />to make the required repairs <br />Contractors who are removed from a contract shall be removed from the participating <br />clist and shall be prohibited from bidding on projects. <br />Project Close-Out: <br />At the time of project completion, the following steps will be taken to close <br />out the project: <br />A final draw/ inspection will be scheduled to confirm that all work has been done <br />according the contract and to execute final draw form, final lien waiver and <br />completion certificate <br />Draw requests will be submitted by CMHP for final payment <br />Lead based paint clearance inspection is ordered and completed (if applicable) <br />Close-out letter will be sent to homeowners and will include: copies of all recorded <br />loan documents, completion certificate and contractor documents <br />10.DENIAL/COMPLAINT/APPEALS PROCEDURES <br />Applicant Denial Procedure: <br />denial will be sent to the household within 10 working days. The denial letter will clearly outline <br />the reason for denial and inform the applicant that an appeals procedure is available. <br />Applicant Complaint Procedure: <br /> Initial applicant complaints about any aspect of service <br />delivery, staff, program restrictions or contractor relations/workmanship may be pursued <br />9 <br />443114v4 MJM EL185-26 <br />