Laserfiche WebLink
The Environmental Impact Statement (EIS) for the Elk River Mining District, which encompassed <br /> 2,865 acres immediately adjacent to the Project, included an analysis of cumulative impacts <br /> related to noise, air quality, traffic, dust and surface and groundwater quality. The City of Elk <br /> River was the Responsible Government Unit conducting the environmental review. The Elk River <br /> Mining District EIS concluded that any negative cumulative effects could be regulated within the <br /> framework of the CUPS issued for each individual mining operation. It is anticipated that, as is <br /> the case with the other existing mining operations, the CUP will contain conditions which will <br /> address and satisfactorily regulate potential environmental impacts associated with noise, <br /> fugitive dust, surface and groundwater protection, and Site reclamation. <br /> 20. Other potential environmental effects: If the project may cause any additional environmental <br /> effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment <br /> will be affected, and identify measures that will be taken to minimize and mitigate these effects. <br /> There are no other known potential environmental impacts resulting from this project that are not <br /> addressed in items 1-19. <br /> RGU CERTIFICATION. (The Environmental Quality Board will only accept SIGNED Environmental <br /> Assessment Worksheets for public notice in the EQB Monitor.) <br /> I hereby certify that: <br /> • The information contained in this document is accurate and complete to the best of my <br /> knowledge. <br /> • The EAW describes the complete project; there are no other projects, stages or components <br /> other than those described in this document, which are related to the project as connected <br /> actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, <br /> respectively. <br /> • Copies of this EAW are being sent to the entire EQB distribution list. <br /> Signature Date August 26, 2016 <br /> Title Environmental Technician <br /> Environmental Assessment Worksheet Page 27 <br /> Elk River Sand and Gravel Mines:Tiller Corporation and Max Steininger, Inc. <br />