My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. HRSR 10-03-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2016
>
10-03-2016
>
8.1. HRSR 10-03-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 3:43:49 PM
Creation date
9/30/2016 12:45:12 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Warranties <br /> • Special conditions <br /> • Amount of contract <br /> • Change order procedures <br /> • Payment terms <br /> • Termination procedures <br /> Loan documents: CMHP will forward the Repayment Agreement to homeowners. Homeowners <br /> will execute the repayment agreement in the presence of a Notary Public, and return the executed <br /> document to CMHP, along with any required owners match funds. All documents must be <br /> executed and returned to CMHP before a project can start. The Repayment Agreement will be <br /> recorded with the Sherburne County. <br /> Notice to Proceed: After receipt of the executed Repayment Agreement, receipt of owners <br /> match funds, and confirmation of construction contract execution, the project can start. Upon <br /> contractor request, CMHP will issue a Notice to Proceed to the contractor and provide a copy to <br /> the homeowner. The notice will allow the contractor ninety(90)days from the date of the Notice <br /> to Proceed to complete the specified work. Ninety (90) days will be the allotted amount of time <br /> except under the following conditions: <br /> • The work is weather dependent and weather conditions have not allowed for the <br /> completion of the work <br /> • The Notice to Proceed is issued too late in the building season to allow weather <br /> dependent work to be completed on time <br /> • The selected contractor is too heavily committed to perform the work within the <br /> allotted time and informs the homeowner and CMHP of the situation. A work <br /> schedule will be established that is acceptable to the homeowner, CMHP, and the <br /> contractor <br /> • Unforeseen difficulties develop with the approved work and force a delay <br /> Failure to Start/Complete Project: Upon receipt of the Notice to Proceed, a contractor will <br /> have 90 calendar days in which to complete the contracted work. Failure to begin work within <br /> the first 60 days will be grounds to terminate the contract unless unforeseen weather issues affect <br /> the start date. <br /> The 90-day time period shall not be exceeded except through the issuance of a change order and <br /> by approval of the homeowner. In the absence of a change order, a contractor who violates the <br /> time period shall be penalized 10% of the unpaid balance for each week that the contractor is in <br /> violation. <br /> Payment Procedures: All contractors will agree to the payment schedule established by CMHP <br /> and the HRA. Typically draws will scheduled to provide for one draw for materials and a second <br /> draw upon completion. Draw requests approved by CMHP must be submitted to the HRA at <br /> least one week before the first Monday of a month to be paid in such month. Approved payments <br /> will be made by the HRA directly to the contractor and will be deemed advances of the Loan to <br /> the Homeowner. Steps and conditions for contractor payment include: <br /> 7 <br /> 443114v4 MJM EL185-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.