My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. PRSR 09-14-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2016
>
09-14-2016
>
3.1. PRSR 09-14-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 2:09:23 PM
Creation date
9/12/2016 2:09:18 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parks&Recreation Commission Minutes Page 2 <br /> August 10,2016 <br /> Mr. Benoit shared an update of how the 2016 Safety Camp went. <br /> 6. Action Items <br /> 6.1 Orono Park Skate Park <br /> Mr. Benoit presented his staff report. Introduced Chris Turner who reported on <br /> skate park design and how it will keep the skaters off the sidewalks in town. <br /> Chair Anderson asked about grading the skate park site. <br /> Mr. Benoit shared that the construction documents will contain the grading line item <br /> and once the plan is approved and funding secured the construction documents will <br /> be presented. <br /> Commission members discussed the parking lot near the proposed skate park site <br /> and if the park should be shifted to accommodate a walking trail. <br /> Moved by Commissioner Sagan and seconded by Commissioner Nystrom to <br /> accept staff recommendation to recommend to City Council to adopt the <br /> Orono Park Skate Park plan as indicated and keeping the original location <br /> discussed. Motion carried 6-0. <br /> 6.2 Capital Park Projects Priorities <br /> Mr. Hecker presented his staff report, stating that the commission should consider <br /> projects that could appeal to a broad range of voters. <br /> Commissioner Holmgren asked why the park projects went from 3,000,000- <br /> 5,000,000 to 2,000,000. <br /> Councilmember Wagner shared that the council believed it was too much to ask for <br /> and wanted to keep the bond to 30,000,000. <br /> Chair Anderson stated that Orono Park and YAC should be built out, fit Hillside <br /> City Park into one the projects along with trail management. <br /> Commissioner Sagan stated that Orono Park should be built out without the splash <br /> pad,put in half the field lights and cut out the east side trails. <br /> Commissioner Ahlness asked if the parking lot can be removed from the list. <br /> ii.OVIERED / 1' <br /> NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.