Laserfiche WebLink
.,/ <br /> Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> September 13,2016 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had eight new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue rebuilding River Ranch in Otsego. <br /> • Continue working on changing out some of the rusty junction boxes or removing ones <br /> that are no longer necessary. During the process of going through these areas,we also <br /> install fuse pads for better sectionalizing when a fault occurs. <br /> • Continue installing a new feeder from the east side of HWY 169 by GRE to the east side <br /> of HWY 10 across from Nature's Edge Business Center. This feeder will give us a feeder <br /> loop under HWY 10 to be used when we acquire area two from Connexus. <br /> • Had to lower some three phase underground primary at the Sherburne County <br /> Government Center for a parking lot they're putting in. <br /> • Had to replace a guy wire pole that was struck by a vehicle on County Road 12 and <br /> Cleveland Street. <br /> • Lightning hit two blades on a pole which caused an outage in Connexus acquisition Area <br /> 1A and 1B on August 18th at 6:15 am. It took approximately an hour to get the load <br /> switched around and the power restored. During the process of moving load around, we <br /> discovered damaged PMH-9 pad mount switchgear that also needed to be replaced. <br /> • Lightning also hit a cutout and dead-end insulator in Dayton on September 5th which <br /> caused an outage. <br /> P0VEHE0 8Y <br /> Page 1 of 1 NATURE <br /> lieReliable Public' <br /> Power Provider POWERED To S ERV E <br /> 142 <br />