Laserfiche WebLink
11- <br /> ■-, 9--. GENERAL GUIDELINES FCII SPACING OF <br /> rifs-L-A)N., A <br /> .z,k TUBE TRENCHES FOR SLOPE INSTALLATIONS <br /> SLOPE GRADIENT TUBE INTERVAL <br /> 6"FREEBOARD AtgidgMftkkin. ,, <br /> #V.IN.. 6" . ,, 1H:1V <br /> 2H:1V 15 FEET <br /> 25 FEET <br /> ,i,..?y• DESIGN. ',. •-,41.::.:4.,..1..,.f,:,.:::.:::,.:.,::: 3H:1V 35 FEET gi.......11•111 r'RT:,:',',"RIREY,"""'w"" GENE RALENOTEAS0:r BE cc.puTE. <br /> .: •07..,v).7,,,,,,t;,,,,,...,,,,,t NOTE I <br /> A4S'.# \" ^' .""A'V,4011gr,„, <br /> :::::::::,..• ....,,, ,.... ,,,,,, ,,4,01, 0. 4H:1V 50 FEET <br /> TO MINIMIZE PIPING AROUND DISCHARGE <br /> ...'.,, ,' ,,,,4.4„,(1.fr,i,* '.. .141111 -1'-i"' ''' 4-.4' >•›,i;! G NERAL GUIDELINES FOR SPACING OF IIMMil PIPE. <br /> & dIP'.1" ic9' I TUBE ETRENCHES FOR CHANNEL INSTALLATIONS <br /> SLOPE TUBE INTERVAL <br /> ..,...1 2.PROPER ORIFICE OPE NING MUST BE FS,I.AETC,ToEND,LCSAITT=DIAZIN <br /> CORRECT AMOUNT OF T ME MOD( <br /> CONDITIONS WARRANT A.ANGE. <br /> TYPICAL PARABOLIC DIVERSION -0, ,--...,-. , ,41116ft <br /> 1"111p■''' 2% I 25 FEET ORIFICE OPENING INSIDE THE 3.EMBANKMENT MUST BE ODMPACTED TO DESIGN SPECIFICATIONS. <br /> . .. .4.1.--4!;-:..:.:,..... ,, -- ,,,,,, HORIZONTAL TUBE WITH A 4 EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED MID EROSION PROTECTION <br /> ....11........,....(:' , lillig 0 :if.;cils,%.,TigENS,w iTH FLOCCULENT PER MANUFACTURER'S %II 111 Ea CONSTANT HYDRAULIC HEAD INSTALLED. <br /> 10%SETTLEMENT sV*01'.1:.I..:•.:::..:i...',4i1•1,.•'-- $1 M. <br /> I SCHEDULE 40 PVC PIPE 5.EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT <br /> .W,,,,0 I..1,If.i.•,,,,,,„ <br /> liw- '',;)".4............•:••;;•..--:-7.,... al° -- 6.FA:PNIFER.ASFIVAERNEDGLEITZRNLY ITIANSURE IT IS FUNCTIONING IN A CORRECT <br /> F/-'1%-•"2-•••• ,,,,f‘• _...............,_,........ "fg;*;::-.::::•-•••-:•••••- -'--,-","..., n.a.N.0W. LEAVE 2 TO 3 INCHES OF <br /> STAKE STICKING UP ABOVE (BARREL OR ARM) 7.EIGHT SIZES OF SKIMMERS ARE AVAILABLE,REFER TO THE FLOW SHEET,CUT <br /> •1 R EEBOAR s Pr. ./''''',...41111111111111111 . .....,....,_,..„.7 'ItZ,,,......._. Ali, ' LOOSE ATERIAL U p5,T,RTE,Piri _ I ra FLEXIBLE HOSE EARTHEN EMBANKMENT <br /> •'?44•41.,•*,,,,w,.,,, ...4.,,g,,,,,:" - :#4.,4.. '4'.• • g FLOAT EMERGENCY SPILLWAY <br /> 6-9 INCH <br /> 1. PREPARE SOIL?EFORE INSTAWNG BLANKETS.INCLUDING ANY NECESSARY APPUCATION?UM E,FERTILIZER,AND SEED. <br /> - 4A/N•' 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BUNKET IN A 6"DEEP X 6"W.TRENCH WITH APPROXIMATELY 12"OF STAPLE FI'W TU',ES , .,,,,, <br /> PVC VENT PIPE <br /> BUNKET EXTENDED BEYOND THE UP-SLOPE PORTON OF THE TRENCH.ANCHOR THE BMNKET WI.A ROW Of STAPLES/STAKES ,i,,, ---* / ., 6"(MIN) <br /> TYPICAL TRAPEZOIDAL DIVERSION ::TOTO"XisLi■cicrsiOnTicr g,OrTiTEZPZ:t:GHLZ:ZfrO'F=Er)BL"OtElMIDINNDHCOTPRA=.ftITRE STAP ES PLACED ABOUT :, <br /> 1 INCHLUPSTREAM OF TUB:11111211111M EMBEDMENT TOP VIEW iT4110,,, SCHEDULE 40 PVC PIPE FLOAT <br /> BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"APART ACROSS THE WIDTH OF IAA% (BARREL OR ARM) <br /> TH BLANKET. PVC VENT PIPE ,_ L <br /> 3.ROLL CENTER BLANKET IN DIRECTION Of WATER FLOW IN BOTTOM OF CHANNEL BMNKETS WILL UNROLL W.APPROPRIATE TUBES <br /> THNW.TAOCIOUN M D AUFCTTESR. <br /> 4,1410111‘. FLEXIBLE HOSE <br /> NOTE 2 S.AGAINST THE.IL SURFACE.AU.BMNKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN <br /> .6 SETTLEMENT APPROPRIATE LOCATIONS AS PER MANUFACTURER'S RECOMMENDATIONS. BEFORE INSTALLATION OF TUBE,SMCOTH AND SHAPE EARTH I Ui, / <br /> SURFAa AND REMOVE ALL STONES,ROOTS OR OTHER DENIS illZ:.77.enno=', • <br /> 4.PLACE CONSECUTIVE BLANKETS END OVER END(SMNGLE STYLE)WITH A 4,6"OVERLAP.USE A DOUBLE ROW OF STAPLES • AS■Ile ■Ii_ <br /> POTENTIAL FOR PIPING CAN li.. <br /> GRMTER THAN 2 INCHES IN DIAMETER <br /> STAGGERED 4"APART AND..ON CENTER TO SECURE BLANKETS. ‘..lat-1111111 OCCUR.PROPER DESIGN TO <br /> 6"FREEBOARD .,,,,,i..'.,....:.:..:::....,.....:,:,.,..:.•1,.,',..,„,. <br /> 5. FUU.LENGTH EDGE Of BLANKETS AT TOP OF S.SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES A MINIMILL DISCHARGE AROUND <br /> ,,,,,, S I G N '*<".S'%V V V,,V NS.V.,' APPROXIMATELY 12"APART IN A 6"DEEP X 6"WIDE TRENCH.BACKFILL AND COMPACT THE TRENCH AFTER STAPUNG. <br /> 6. ADJAaNT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 4,6,DEPENDING ON BLANKET TYPE)AN D STAPLED.TO ENSURE IE INSTALLI7J,Lct,t="T.16Tu7E31g= s. 1 PIPE MUST OCCUR. Tit...,,,, 0 '•\,‘,;.::',;,,E1.''''" <br /> et4Z/Z.Z' 4'9 \444N;ci,,g'' <br /> PROPER SEAM ALIGNMENT,pLAcr THE EDGE OF THE OVERLAPPING BLANKET(BLANKET BEING INSTALLED ON TOP)EVEN WITH <br /> TOTES THE SEAM STITCH ON THE 13LANKET BEING OVERLAPPED. WATER ENTRY UNIT <br /> END <br /> 7.IN HIGH FLOW CHANNEL APPLICATIONS,A STAPIE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT(9m-12m)INTERVALS.USE 0 I VIEW <br /> TYPICAL VEE-SHAPED DIVERSION A DOUBLE ROW OF STAPLES STAGGERED 4".ART AND 4"01.1 CENTER OVER ENTIRE WIDTH OF THE CHANNEL MWM=Sk'm. • \.• ' <br /> a. THE TERMINAL END OF THE BMNICETS MUST BE ANCHORED WITH A ROW Of STAPLES/STAKES APPROXIMATELY 12"(30cm) <br /> OOT OVER.•', 6 TO 8 IN.WIRE STAPLES A11.11.11.11.11.11.111.1tAilliaill.11.111.111.11.11ablItliller,,, <br /> APART IN A 6"DEEP X 6"W.TRENCH.BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. SPACED 1 FOOT ON CENTER <br /> NOTES: 9. MACE STAPLE/STAKES PER MANUFACTURER'S RECOMMENDATION FOR THE APPROPRIATE CHANNEL FLOW OR SHORELINE 6-9 INCH TUBES <br /> '8,..... leii,t;.....4. ., <br /> DISCHARGE PIPE MAINTAIN DEPRESSION TO ....11=111.11.111. <br /> I.REMOVE ANY EXISTING VEGETATION AND APPU.TION SCHEDULE 40 1.!.11,!,',' MIN'I"CHABECCE0a1FItTG'S= <br /> SCARIFY OR BENCH ADJACENT SOILS PRIOR TO 1.6.41.1111.,....4141, <br /> PLACING BERM. <br /> 2.BERM MATERIALS MUST BE ADEQUATELY <br /> =i4E:ir .O <br /> NOTES: <br /> COMPACTED AND STABILIZED. CRITIC PINTS P 1 LZEFSESDDIJIANUSBTE=ETTIEN CCIEI STAKES SPACED 1 FOOT ON CENTER <br /> A''''A'Aft''IA"' '::°"=A1:1;;T:P:1:CIii;I:FINNE'Ys'ut:Rf‘lit''Cl'ir UPSTRMM AND CflIVE STAKES INTO <br /> TEMPORARY DIVERSION DITCH == <br /> 1:ZETZuJ:,TTDRMAT=7,11"a"as <br /> THIS INDENTATION 'ED FAIRCLOTH SKIMMER DISCHARGE SYSTEM WITH EMBANKMENT me <br /> • ,..■........ ,,fci= ' <br /> cPs`17.4'J'Ilt:r :.(ljtIRSYP:DL'fIO:Ps SINIERS E■PKtiL„7 ,, MOTTO SCALE <br /> ON.1 PLAN <br /> NCONIROL TECHNOLOGY <br /> I,.,0:71,ILILSPLL IF KAT ION FOR PROW(1 <br /> C) BIO-ROLL <br /> C) EROSION PROTECTION BLANKET , NO I ILI bt-Act <br /> .............., <br /> :STFEENNESC!Sra f"L'Y'LTIO°V13f ON/E N SEDIMENT STORAGE FINISHED G.DE • ....• ....::...,l,,,:;:.;:::::•..:::::::::,::::,.:: ::::. <br /> WIRE FENCE WITH TEE TES <br /> ,S,P0ATCEED AT 30"ON HR CENTER(SEE ,.....-,--...7.......'--- , -:.„7,7l.'71:i.:::::::::;:::::;:i:::::.•:......,....,....• .-' <br /> #141=61Wdalt,11,,M. ,...-."'----- • ,'''.. 3.1 i-•:„..i,sw0011110 <br /> FETZCTIC.X.CTil CPNOEST\:11 II771 ' ---- <br /> h- 4'",., THAFEAESTWX:FTGIE(:E°ERNOTTHEE11 ;•'slilirt.'.. 4.4,.....,. .,------,-------------,--- <br /> _--. <br /> --ien..-.--- CROSS BRACE ,;;',„....A-....7...;;.....•!4.•;_:. STEEP SLOPES(3'1 OR GREATER, <br /> ''• <br /> 0 11C".••-*'------'...Z---, ..._, :ii ; : • T•3"CT E TAIIISBTEOZ .....1.i.T.,,,..,1.14-.001:0;....7....=.1 <br /> '''.5 1 1111111 <br /> •••••z ' ,:::: :::::::: --• <br /> 1 -,-.::::. •''.::::::,- ,i.,•::.,, , ,,,,T.,,,,, <br /> it,4titit:t':;',,•'IV""4=-7-----177.7 ..AV:,.%7 I,,e'.-. <br /> 2,4,00.1 '''.•:' ---------...11 "•••••2 1 II 1 i 4.A':•';Vt.;4.41illre. <br /> ',S,‘:e',..,.eii..q.S.. '.."S.4.,,-'''''''''' AV.; •, -- <br /> 0.0.,9111. ,Iti, ...••' '41:laIIIIIIIIIppsr •-•...-''''''. 14.4',4.7. <br /> WIZ I=E 11 1 i ' tet`iiitIe.-..f A ......1,,:re.1........- <br /> •2.1'.1. 0.'40 <br /> STAKE .••is: <br /> 9-1 t..:1'. -k,eire•r4,rs t.'"?se4Ze. <br /> ,-,,..f..0%;f:4,44%;:ose:A_,- -,,r. <br /> VItt,,:;.7.V.47.1jirAiiliitk-- ---1=7. 1C111F <br /> ,,..,,,,t',,:,::-%,,,_!..■,- ;,.-'''''---9, 1: RIP.P <br /> ..,:11-7;;T:.:,:::::=::..774-7, HMDWALL LESSER SLOPES(LESS THAN 3:1) <br /> FENa MATERIAL •....,::,::::::::::::::::::: TO ADJACENT STAKES W. <br /> RIP.P .. /I rf,,ffiff,f4,, pipE. PURPOSE: <br /> \N ISI glEICIELIEGEIRE=TN SDCEEFCOARTINXII=FE CR'lliLLISVI EIRLEf:YCFAUEOIVNUSNOFTRIFEArRNOUVESNTGTA'RE <br /> TO: <br /> EXTEND SILT FENCE s_1,.... . <br /> PLAN •REDUCE EROSION POTENTIAL BY DECRMSING RUNOFF VELOCITIES <br /> 1,0"INTO GROUND •A504 i. POSTS:2 X 4 WOODEN STAKE FENCE: •TRAP SEDIMENT <br /> ‘-./..... . WOVEN WIRE,14-1/2 GA.,6"M..MESH FINISHED GRADE •INCREASE INFILTRATION OF WATER INTO THE SOIL <br /> OPENING FABRIC:IN ACCORDANCE W. •AID IN THE ESTABUSHMENT OF VEGETATIVE COVER VIA MOISTURE STORAGE <br /> ASTM 0 M61 LATEST EDITION. RIPRAP HEADWALL 3, <br /> 8IPRAP pip, GENERAL NOTES: <br /> S :IETILEITA CLEAN S3.0t:E <br /> ,,,,,, <br /> ••Isr.,. ' --a <br /> ,,,,,,,,,:f. 1. PROVIDE A ROUGH SOIL SURFAa WITH HORIZONTAL DEPRESSIONS. <br /> 2.CAN BE COMPLETED WITH A'MIER OR OTHER EQUIPMENT WITH SIMILAR EFFICIENCY. <br /> T f-:V.-.401:04 sr..+740,4. 3.DURING MASS GRADING,MAINTAIN SLOPES IN A ROUGHENED CONDITION WITHOUT FINE GRADING. <br /> \ -1., ....,,If.r.,grsel... .- - - .. 4. SURFACE ROUGHEN!.SHOULD BE PERFORMED AFTER FINE GRADI.. <br /> 1.ATTA.THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE(SPACEDHEVERY T. \‘, 1.5•Pr/ v /\/\/ 5.ROUGHENING CANNOT BE USED IF SANDY OR ROCKY SOIL IS PRESENT. <br /> 6.FILL SLOPES CAN BE CONSTRUCTED WITH A ROUGHENED SURFACE. <br /> DEIXOTAILLT 1470=ETSHCRIO=THEAFSXIT Wit:AACHEF%WfalET'AT MT'"19:XILIAtLer/1-P2R7AC EACH ,\ - \ \ 7.C.SLOPES THAT HAVE BEEN SMOOTH G.DED SHALL BE ROUGHENED AS A SUBSEQUENT OPERATION. <br /> 3.T=A°NSCEEC8THI CAT IISEEPT VFORE INIAAST1:10ITAELDAIT=ESN/TP rDNEE:TSTI OEFYZICAULLMBUEMTETZIZEVIMSASYNNOICT''''STh- /\/ /\/\/\/\/\/\A/\/\/\A INSTALLATION AND INSPECTION AND MAINTENANa NOTES: <br /> EXCEED ONE-HALF THE HEIGHT OF THE FABRIC.MAINTENANCE CLEANOUT MUST BE CONDUCTED REGULARLY TO MN DOT 3733 TYPE V <br /> PREVENT ACCUMUMTED SEDIMENTS FROM REACHING ONE-HALF TIE HEIGHT OF THE SILT FENa MATERIAL ABOVE GEOTEXTILE UNE R FOR 2:SAENEYSITSZ=EXTVAT=CRE LAI ENICNEARCTILVI PFIORI N.G..F <br /> __THAN 14 CONSECUTIVE DAYS-OR LESS PER <br /> EN <br /> All <br /> GRADE. CROSS-SECTION SEPARATION <br /> 4. SILT FCE INLETS SHALL INCWDE WIRE SUPPORT APPLICABLE MW(S)-MUST RECEIVE SURFACE ROUGHENING IN ADDMON TO THE IMPLEMENThTION OF <br /> ON ON OL MEASURES <br /> 3:gl'EASTS),AZ:LILITTSTAELTRHOSFIll20::T.:1;HAT IS,ALONG THE CCNTOUR.(s. <br /> SILT FENCE INLET PROTECTION(IP-1) <br /> ROCK PIPE INLET PROTECTION(IP4) <br /> :. 1°1ULTZ:TZ:ENE:Antir), :EF"PZTABEgLE g=.RIGID sHAN <br /> TO TRACK THE SLOPES.ACCORDING TO THE DETAIL <br /> 7.IN ADDITION TO DAILY INSPECTIONS,THE CONTRACTOR SHALL INSPECT THE SURFACE ROUGHENING AT THE <br /> N.I., <br /> FOLLOWING INTERVALS. <br /> :1:111:114TTEELLYY EFaLLgrIft ANTYTURNTETTNI"G. <br /> SURFACE ROUGHENING <br /> Aik.----, <br /> tittSambatek Summary Revision History <br /> Designed:NRH <br /> Approved:DS <br /> Phase:PRE U MI NA. <br /> rawn:N. <br /> I' www.sambatelccom Book/Page: <br /> EnglneerIng1SuneyIng1Plannng I Environmental <br /> Initial Issue:o6/29/2o1.6 No.Date By Submittal/Revision <br /> .,'Certification <br /> pi hereby certify that this plan,specificat;o0was prepared by Client <br /> me or under my duect supervision and th.t uly licensed PAXMAR rofesmonal ENGINEER under the laws te of Minnesota. IT <br /> Nathan R.Herman fiti.\ -- <br /> RegIstration No.479A... e: <br /> tf epplicable,cont. wet signed copy of thn plan wluch n evadable <br /> upon request at SambM7 Minnetonka.MN office. Project <br /> RIVER PARK <br /> FOURTH ADDITION, <br /> ELK RIVER,MN Sheet Title <br /> EROSION&SEDIMENT <br /> CONTROL DETAILS Sheet No. Revision <br /> C5.05 <br /> Project No.PAX 20460 <br />