i
<br /> I
<br /> I
<br /> 1—DEFLEC tOR FLA'L
<br /> /I ^VER,OW• CENTER
<br /> ':7`N.TEP.AStrMJL`!
<br /> Vs':%if MC::;r!F.E'Nr':pCEMENT{n-nceeta} ,,---„,RFL:1W 2-'OP C>F”
<br /> ti ,EOTEXTILE=AeRIL .. J' ;+ C I:RB FKIK •• ':
<br /> ::0,;PACIN"--SEE NOTE. ti t :•,o.: •1:•:
<br /> A!If:lt:AY!:tif R7A(i!!+f.NC'H. � s � __ :•'; �B•'"
<br /> ?A:,KF4L WI'H"A!4FED '(}" F( R Y �L 0.8.:V.*:.p�
<br /> ir J, VA"T14A1�Q" ,e jy r •...:o a :•+O'
<br /> is� i' �`` ..o�o�e o0
<br /> 1 r 5-MIN, .1 l i;::•0 Gip / , ` •�;°oo o•
<br /> 1-_-L-._._---- --i._T. . 9.10 .G.d.... xii, .vi,,,,,n,..--,,,,::,,,,,,__, --,,,,------ ----4,„ ,;'/---,,,,, '---,, ,,,,,
<br /> ".� }a. ..r......8+MIN. ~'�� r ; r� �f !j.• �.. '� �.
<br /> NOTE: )l l ��Ck..3
<br /> 0.
<br /> ' 6-MIN. ��4% F � r�*t �n`ti``4� ! ' .. „f�,�f,`t PLAN
<br /> I.S11_T aro: CO'd,Ro F WITH rUPP0 T CR"'r' PO.,SHALL ill:: / _..41.4AtMi l:IPA,►y�r. ``'',,,,,s, 'f'C"'L or\∎ �`"•�'�•, 1 r ',•'�'' -
<br /> ,ACE.O AT 1C 0+'I S AND TNV"N AT EAST 2 INTO THE GPCRINP. J r s�'^�*�'i��P • sr • ,��/°'1* DRIPUNE
<br /> '.M..1 FF.NC.'F,(N`r RUB.'EC MtHOU•SUP,,PI FENCES,POST SHALL.HE. .4,
<br /> r
<br /> `TAM Al 4'OR..E�!;,ANG DRIVEN,-,LAST}'INTO THE(10LING. �) I :� r'-
<br /> 4'SNOWFENCEW/ POSTS @ 8'O.C.(MAX)
<br /> AT DRIP LINE OF ODELN(:C;3t1C/ OUTERMOST BR—+/ OR EQUA LOCATIONS PLAN FOR
<br /> .....................................
<br /> •"SHREDDED HARDWOOD
<br /> .. .:''... ............ MULCH.REMOVE VEGETATION
<br /> ..............:............,.:.
<br /> ROCK ENTRANCE NEED,TO BF tNPLACF(MIN 10•IN BEFORE INSTALLING MULCH.
<br /> LENGTH)WITH ENOUGH MATERIAL ON HAND AT SITE TO
<br /> C.PLETE TO GARAGE AFTER BACKFILL'N ORDER TO ELEVATION
<br /> PASS INIT....INSFECTICN
<br /> REV 7/2007 REV 7/2007
<br /> REV 3/2 10, NOTE:TREE PROTECTION SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED TO ENSURE
<br /> STANDARD SURVIVABILITY OF EXISTING TREES TO REMAIN.NO HEAVY EQUIPMENT SHALL BE STORED
<br /> • STANDARD SILT FENCE p '• ROCK CNSTRUCTiON�VM tCE STpN�ID11R0 WITHIN THE TREE DRIP LINE AS DESIGNATED ABOVE.
<br /> INLET PROTECTION STANDARD
<br /> 2009 E 81111.DN0 FIERWIT N0 FOR CATCH BASIN (IP2) " 5 TREE PROTECTION DETAIL
<br /> yr . v_ 2015 2512
<br /> . ,
<br /> D
<br /> (RECOMMENDED SPACING
<br /> I D=(100XH)/2)
<br /> WATER FLOW _y
<br /> Z=91 ���-1 GENERAL RULE FOR SPACING:
<br /> ....."....• 4,4 H THE BOTTOM OF THE UPSTREAM
<br /> '1�`°y+•.�'�-� / BERM SHOULD BE AT THE TOP OF
<br /> I "V'• THE NEXT DOWNSTREAM BERM
<br /> 2 ACRES OR LESS OF DRAINAGE AREA
<br /> 6"1
<br /> SIGN TO INDICATE THE ��r--..
<br /> LOCATION OF THE CONCRETE ��-
<br /> WASHOUTAREA GROUND SURFACE ~_�` 'n
<br /> BERM AROUND PERIMETER
<br /> FILTER FABRIC"•^ -� ,
<br /> 12"MIN
<br /> 12"MIN 2.-0"MIN
<br /> 2"3" (DOWNSTREAM VIEW)
<br /> ///%%�/%//., CLEAN STONE
<br /> COM PACTEDEMBANKMENT H: L:H SIDE SLOPES
<br /> NOTES:
<br /> 2.10 ACRES OF DRAINAGE AREA
<br /> I. CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT 6"1
<br /> ON SITE.
<br /> 2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 30 MIL THICK PLASTIC -77-77--77T-
<br /> OFF 3. VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS -
<br /> OFF PAVEMENT.
<br /> 4.SIGNS SHAH BE PLACED AT THE CONSTRUCTION ENTRANCE,AT THE WASHOUT AREA, FILTER FABRIC ~
<br /> AND ELSE WHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF Tf1E (DOWNSTREAM VIEW)
<br /> CONCRETE WASHOUT AREA 7O OPERATORS OF CONCRETE TRUCI(S AND PUMP RIGS. 2^.3^
<br /> 5.TAHS E sCsRA T WTA:g VILL Y BFO R EWAASIRED D ACNO7N .GED'CEANEDOUT CLEAN STONE
<br /> 6. AT THE END OF CONSTRUCTION,ALL CONCRETE SHALL BE REMOVED FROM THE SITE
<br /> AND DISPOSED OF AT AN ACCEPTED WASTE SITE. FLOW 21�,-/ 21
<br /> 7. WHEN THE CONCRETE WASHOUT AREA IS REMOVED,THE DISTURBED AREA SHALL BE -
<br /> SEEDEOAND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE
<br /> CITY.
<br /> RIPRAP
<br /> �J CONCRETE WASHOUT AREA ROCK CHECK DAM
<br /> N.T.S. N.T.S.
<br /> '—' Summary Revision History Certification Client Project Sheet Title Sheet No. Revision
<br /> `kstsDesigned:NRH No.Date By Submittal/Revision Ihereby certify that this plan.specifkationorr wasprcparedbY PAXMAR RIVER PARK EROSION&SEDIMENT
<br /> C 5.04
<br /> � Approved:D5 a PhaSe:PREUMINARY L Drawn:NRH Nath Book/Pag
<br /> J J Re`pptrable.cOtact d ELK RIVER,MN Project No PAX 20460
<br /> EnpMeeAng I Surveying I Planning I Ernlronmentr'!I Initial Issue:o5 29 zole Ifa Ilubia,coMKtwelsigned co ofthK en whichlsavailable
<br /> upon request K Sem k's,Minnetonka.MN office.
<br />
|