My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2B PCSR 07-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
07-26-2016
>
4.2B PCSR 07-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 4:05:41 PM
Creation date
7/21/2016 4:03:02 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/26/2016
case
CU 16-10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 19, 2016 <br />Elk River Senior Properties <br />VIA EMAIL: greg@nottinghamconstruction.net <br />Attn: Greg Johnson <br />6750 Stillwater Blvd. N Suite 200 <br />Stillwater, MN 55082 <br /> <br />RE: Comment Letter, <br /> Conditional Use Permit CU 16-21 <br />Zone Change ZC 16-05 <br />Dear Mr.Johnson, <br />Staff conducted a review of the submitted materials on June 27, 2016. The following comments and <br />recommendations are intended to bring the project in line with current city requirements and should <br />be addressed on future plans. It is helpful to include a respon <br />Unaddressed comments will be incorporated into recommended condi <br />Permit approval. <br />Engineering: <br />1.Provide additional site grading detail. <br />2.Sidewalk at the proposed entrance will need pedestrian ramps, co <br />standards. These shall be constructed to current MnDOT standard <br />domes. <br />Stormwater: <br />3.A MIDS water quality report and a table noting existing and prop <br />show if stormwater management is being achieved. <br />4.Soil borings indicating groundwater depth and infiltration ratesinfiltration <br />basin location is required. Three feet of separation between the <br />infiltration stormwater basin and groundwater is required. <br />5.A SWPPP sheet and detailed erosion and sediment control plan is <br />permit requirements listed. It needs to be noted that this site <br />water: Mississippi River with required specifications. <br />6.NPDES permit is needed for construction activity disturbing one <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br /> <br />www.ci.elk-river.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.