My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5. SR 07-18-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
07-18-2016
>
7.5. SR 07-18-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 9:28:21 AM
Creation date
7/15/2016 9:08:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utilities <br />The property is located in the Urban Service District. Although the plat does not require city services, all <br />permitted and conditional uses in the commercial district require city services. Connection is required for <br />future approvals. <br />Park Dedication <br />On June 8, 2016, the Parks and Recreation Commission reviewed the preliminary plat and recommend <br />that park dedication be satisfied in the form of cash. Additionally, a 30 -foot trail easement was <br />recommended by staff and Planning Commission to be provided on the south end of the property along <br />the rail line in Oudot A. <br />Right of Way Encroachment <br />The proposed parking encroaches on existing street right-of-way between approximately 3 feet on the <br />north end and 6 feet on the south end (see Easement Vacation Diagram). City ordinance requires a 10 -ft <br />property line setback for all parking and drive areas. When the area was initially platted, the triangular <br />parcel was not included, which left a unique remnant of property due to the alignment of Zane St. <br />To accommodate the proposed parking, a street vacation will be required to allow the proposed parking <br />to comply with city code. This will also establish consistency in the right-of-way along Zane St. If the <br />easement is vacated, a drainage and utility easement must be established between the new right-of-way <br />line and the existing right-of-way line. Utility lines in this area were constructed down the centerline of <br />Zane St. and due to the depth of the utilities, additional width is required to ensure access for future <br />maintenance activities. The applicant shall provide all legal descriptions of vacated streets as well as <br />drainage and utility easements. <br />The alternative to an easement vacation is a license agreement allowing the parking lot to encroach onto <br />city right-of-way, or amending the current site plan. Staff recommends vacating the right-of-way as the <br />land does not serve a public purpose, and it removes the need to track and administer a license <br />agreement. <br />Applicable Regulation <br />Preliminary and Final Plat <br />Approval of a plat may only be ordered if the following findings have been made, as outlined in Section <br />30-375: <br />(1) The proposed subdivision is consistent with the honing regulations (article VI of this cbapter) and conforms in all <br />respects witb all requirements of this Code, including the honing regulations and this article. <br />The property is zoned Highway Commercial (C-3). The proposed subdivision is consistent with the <br />zoning regulations outlined in the city code and approved plans. <br />(2) The proposed subdivision is consistent witb all applicable general and specialised city, county, and regional plans, <br />including, but not limited to, the city's comprebensive development plan. <br />The proposed plat does not conflict with any city, county, or regional plans, including the <br />Comprehensive Plan. <br />(3) The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion <br />and siltation, susceptibility to flooding and drainage are suitable for the type and density of development and uses <br />contemplated. <br />The site is suitable for proposed uses in the C-3 district. The applicant and city staff will work together to <br />finalize grading, erosion control, and drainage plans as development occurs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.