Laserfiche WebLink
PROJECT: WWTF Improvements <br />DATE OF ISSUANCE: 2/19/2015 <br />SECTION 00991— CHANGE ORDER <br />EFFECTIVE DATE: <br />No. 1 <br />OWNER: City of Elk River, Minnesota <br />ENGINEER'S Project No.: T21.106811 <br />CONTRACTOR: Rice Lake Const, Group ENGINEER: Bolton & Menk, Inc. <br />You are directed to make the following changes in the Contract Documents. <br />Description: <br />The project was bid in June 2014 and Notice to Proceed was not received until October 2014. This delay was due to the <br />MPCA not having the NPDES permit and EAW approved. Plan and specification approval was not granted until <br />October 28, 2014. At that time construction could start. Shortly after construction started a black cinder material was <br />found in the excavation area and this material required special disposal. There were time delays due to testing of the <br />material and determining locations where the material could be disposed. Due to these delays the contractor is <br />requesting additional costs and time extension. We recommend Option I as outlined in Rice Lake's letter. <br />Reason for Change Order: <br />Delay in obtaining plan and specification approval, the NPDES permit and EAW from the MPCA. Also, black cinder <br />material was discovered in the excavation area and required special disposal. <br />Attachments: (List documents supporting change) <br />See attached letter from Rice Lake Construction Group dated <br />Jan. 27, 2015. <br />CHANGE IN CONTRACT PRICE: <br />CHANGE IN CONTRACT TIMES: <br />Original Contract Price <br />Original Contract Times <br />Substantial Completion :730 days or dates <br />$16.525.200.00 <br />Ready for final payment :700 days or dates <br />Net changes from previous Change Orders No. _ to No. 1 <br />Net changes from previous Change Orders No. to No. I <br />$0 <br />U days <br />Contract Price Prior to this Change Order <br />Contract Times prior to this Change Order <br />Substantial Completion :O days or dates <br />s]6,525.200.00 <br />Ready for final payment :O days or dates <br />Net Increase of this Change Order <br />Net Increase of this Change Order <br />$259 991.59 <br />138 days <br />Contract Price with all approved Change Orders <br />Contract Times with all approved Change Orders <br />Substantial Completion :838 days or dates <br />516.785.191.59 <br />Ready for final payment :838 days or dates <br />RECOMMENDED: A—r APPROVED- ACCEPTED: <br />Engineer (Atn prized Signature) Owner (Authorized Signature) Contractor (Aufftized Signature) <br />Date: 2/19/2015 Date:— Date: 3/s/(5 <br />EJCDC No. 191OC8-B (1990 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. <br />T21.10681 l —Elk River, MN CHANGE ORDER <br />Wastewater Treatment Facility Improvements PAGE 0099 1 -1 <br />