My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6. SR 07-18-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
07-18-2016
>
4.6. SR 07-18-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 1:56:20 PM
Creation date
7/14/2016 12:42:58 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• BC> L—TON & M r-= N K <br />Consulting Engineers & Surveyors <br />" 12224 Nicollet Avenue • Burnsville, MN 55337 <br />Phone (952) 890-0509 • Fax (952) 890-8065 <br />www.bolton-menk.com <br />July 6, 2016 <br />Mr. Justin Femrite, P.E. <br />City Engineer <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />RE: Elk River WWTF <br />WWTF Improvements Project <br />Project No.: T21.106811 <br />Dear Mr. Femrite: <br />NG® <br />The purpose of this letter is to request additional engineering fees for the construction portion of the <br />wastewater improvements project related to additional days added to the contract time for change orders. <br />The design documents included a construction schedule of 700 days and there has been one approved <br />change order to date adding 138 days (4.50 months) to the construction schedule. The contractor has <br />requested another change order, change order 2, for a request of 5 additional weeks (1.15 months) due to <br />delays in getting the correct microbiology started in the aeration basins. The total time added to the <br />construction contract from these two change orders is 175 days (5.65 months) and will result in additional <br />engineering fees that were not originally included in our proposal. Our original construction fee was for <br />$429,415 for a period of 13 months which equals approximately $33,000/month. Based on the addition <br />of the 173 days (5.65 months) to the construction contract we are requesting additional fees in the amount <br />of $186,450. I have included a copy of the two change orders with this letter for your reference. <br />We appreciate your consideration of our request and I am hopeful we can come to an agreement regarding <br />our construction services. If you have any questions regarding any of the above please do not hesitate to <br />give me a call. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Seth A. Peterson, E. <br />Principal Engineer <br />Enclosures <br />G:\ElkRiver\121106811\1 Corres\femrite ltr 06july2016.docx <br />DESIGNING FOR A BETTER TOMORROW <br />Bolton & Menk is an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.