My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 07-05-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
07-05-2016
>
4.5. SR 07-05-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2016 9:57:59 AM
Creation date
7/1/2016 8:06:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/5/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project o r o a <br /> Deliverables: Draft addenda if necessary. Prepare bid tabulation and award recommendation letter. <br /> Phase 6 — Construction Inspection, Staking and Management Services <br /> Task 1 —Pre-Construction Conference <br /> Coordinate and attend preconstruction conference. <br /> Task 2— Construction Administration <br /> The Project Manager will be responsible to coordinate and administer the construction contract, interpret <br /> the contract requirements and advise the City concerning the performance of the contractor. The Project <br /> Manager in cooperation with the Construction Observers will review and certify contractor pay requests. <br /> The Project Manager will conduct recurring visits to the site at a minimum each day that major contract <br /> quantities are occurring. The Project Manager and Construction Observer will coordinate and keep the <br /> City of Elk River informed of the status of the project. The Project Manager and Construction Observer <br /> will also develop the schedule of materials testing. <br /> Task 3 — Construction Observation <br /> The Field Representatives will provide full time construction observation and keep the City informed of <br /> progress through verbal communication and daily written reports. The Construction Observers will be <br /> responsible for documentation of actual quantities and verification that construction materials and <br /> methods are in accordance with the contract documents. Daily reports will include weather conditions, <br /> summary of contractors work force, quantities completed, site correspondence and hours worked. <br /> Task 4— Construction Staking <br /> Offsets will be provided prior to beginning removals and reclamation. Utility, storm sewer and curb <br /> stakes will be provided as necessary. <br /> Task 5— Substantial Completion Inspection <br /> The Project Manager, Construction Observer and City representative will conduct the substantial <br /> completion inspection of the project. Based on the inspection, a punchlist will be prepared and delivered <br /> to the Contractor. <br /> Task 6—Acceptance Letter <br /> Once the Contractor has completed all punchlist items to the satisfaction of the City and Project Manager, <br /> an acceptance letter will be drafted for consideration by the City. <br /> Task 7—As-Built <br /> Receive, review and assemble all as-built information onto the drawing and specifications. <br /> Deliverables: Meeting minutes, daily construction observation reports, shop drawings, payment requests, <br /> project closeout information, project punchlist, final acceptance letter, and electronic and hard copies of as <br /> -built drawings and specifications. <br /> Project Approach, Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.