Laserfiche WebLink
(4) The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, <br /> erosion control and all other services,facilities and improvements otherwise required in this article. <br /> The subdivision will connect to city sewer and water services, the streets will include storm <br /> drains with associated stormwater treatment ponds. <br /> (5) The proposed subdivision will not cause substantial environmental damage. <br /> The area was the subject of an EAW and has already been rough graded for the subdivision. <br /> The project will not cause substantial environmental damage. <br /> (6) The proposed subdivision will not conflict with easements of record or with easements established by judgment of <br /> a court. <br /> The subdivision will not conflict with easements of record. <br /> (7) The proposed subdivision will not have an undue and adverse impact on the reasonable development of <br /> neighboring land. <br /> The lands to the north, east, and west have already been developed and include Twin Lakes <br /> Road, single-family development as part of River Park Second Addition, and a large lot single <br /> family development. The area south of the plat was included in the Miske Meadows PUD. <br /> (8) The proposed subdivision is not premature.A subdivision is premature ifan5 of the following exists: <br /> a. Lack of adequate stormwater drainage. <br /> b. Lack of adequate roads. <br /> c. Lack of adequate sanitary sewer systems. <br /> d. Lack of adequate off-site public improvements or support systems. <br /> All of the above services or improvements will be connected or constructed as part of the <br /> development. The area is within the municipal service area and existing facilities can <br /> handle the additional capacity. <br /> The project appears be consistent will all required findings for approval of the Preliminary Plat. <br /> If denial of the plat should occur,it shall accompany recommendations or determinations by findings or a <br /> report stating how the proposed use does not comply with the standards set forth in Section 30-375. <br /> Financial Impact <br /> None <br /> Statutory Review Period <br /> Per State Statute 15.99 the required 120 day review period for the plat ends on August 23, 2016. <br /> Council Meeting <br /> If acted on, this item will go to the June 20,2016,City Council meeting. <br /> Attachments <br /> • Location Map <br /> • Applicants Narrative <br /> • Site,Plat, and Landscape Plans <br /> • Lot Width and Area Plans <br /> \\dc3-elkr\shared\Departments\Community Development\Planning\Case Files\P\P 16-05 River Park Third\Planning Commission 5-24-2016\P <br /> 16-05 PC Staff Report RP3.docx <br />