My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4 PCSR 04-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
04-26-2016
>
6.4 PCSR 04-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 11:46:13 AM
Creation date
4/22/2016 11:15:20 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2016
case
P 16-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAXMA R© <br /> Park lands will be dedicated as they are properly graded and in the plats they are adjacent <br /> to. <br /> Presuming there is not another substantial economic shock, a new phase per year is <br /> anticipated, allowing use of the southerly park lands by 2020, with all new roads being <br /> completed by about 2021. <br /> Outlot D of River Park is across Highway 40 and is a small Cul de sac for 65' wide lots. <br /> Water and access is available, but sewer is preferred to be part of a larger lift station <br /> planned to serve the land to the east when the time is appropriate. It is relevant to plan <br /> those lands under similar ownership to manage project certainty and design for the <br /> known issues of ponding, public roads, etc. <br /> III. NATURAL RESOURCES <br /> A. Wetland Delineation confirmation <br /> Sambatek has field verified prior boundaries that were plotted previously. Areas in Phase <br /> one have concurrence from City regulators for a fill permit to be submitted as a separate <br /> action for the required road connection of Edison. Mitigation is provided for on site. <br /> Wetlands on Phase III lands between proposed Johnson Street and Ivanhoe Drive have <br /> been plotted similar to the previous master plan approvals, but will be reviewed in the <br /> spring of 2016. They were farmed as permitted over the last several years and will have a <br /> recertified boundary assigned by the City as part of a separate review. That boundary <br /> will only confirm the setbacks to wetland impacted the proposed lots to the north. That <br /> boundary does not affect buildability, only lot pad size. <br /> B. Soil and Groundwater <br /> The soils are free draining fantastic for home building, may have several zones capable of <br /> crushing on site for road base to minimize import trucking near existing home sites and <br /> will allow for infiltration per current goals of water resource planning. Groundwater <br /> recharge is enhanced from prior calculations, but is substantially similar to the previous <br /> master plan. Most of Phases one to four drain to the north, the balance to the south. <br /> C. Existing Trees <br /> Existing tree cover exists throughout the phase three lots of Johnson and Ivanhoe Drive. <br /> Back yard areas will be preserved for quality with trees in the road and front yards <br /> through home pads removed per City standards. Deadfall will be removed. Fill of about <br /> 5' over existing ground elevations is required on Johnson Street to provide proper <br /> drainage. This is not as significant a fill as was previously planned. While this stand is <br /> in decline, the new urban forest will complement in future size and add a projected 82 <br /> new trees at a minimum of 2 per new housing unit. As many Elk River new residents do, <br /> 5160 Viking Blvd. NW <br /> Anoka, MN <br /> (763)753-6176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.