Laserfiche WebLink
EXHIBIT C <br /> LIGHT OUT DETECTOR 1.0 EA N 1,023 <br /> RADARPACKAGE 1.0 LS N 75,000 <br /> RELAY,DAX 8.0 EA N 8,000 <br /> RELAY,GATE DOWN 1.0 EA N 1,000 <br /> RELAY,ISLAND 1.0 EA N 1,000 <br /> SIGN,2 TRACKS 2.0 EA N 62 <br /> SURFACE ROCK 30.0 CY N 1,500 <br /> TELLULAR DEVICE(RTU) 1.0 EA N 3,052 <br /> TOWER,20 FT 2.0 EA N 5,116 <br /> TOWER,FOUNDATION 2.0 EA N 1,576 <br /> USE TAX 26,717 <br /> OFFLINE TRANSPORTATION 4,434 <br /> TOTAL MATERIAL COST 384,818 384,818 <br /> OTHER <br /> AC POWER SERVICE 1.0 EA N 5,000 <br /> CONTRACT ENGINEERING 1.0 LS N 28,000 <br /> CONTRACT LABOR 520.0 MH N 65,000 <br /> DIRECTIONAL BORING 400.0 FT N 20,000 <br /> TOTAL OTHER ITEMS COST 118,000 118,000 <br /> PROJECT SUBTOTAL 688,720 <br /> CONTINGENCIES 68,872 <br /> BILL PREPARATION FEE 7,576 <br /> GROSS PROJECT COST 765,168 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 765,168 <br /> Page 5 of 5 <br />