Laserfiche WebLink
road extension, there are no plans to build a street over the road dedication, only a <br />pedestrian trail for access to Lincoln Street which allows for a deliberate connection to <br />roads and trails to the school and park facilities already built. <br />Park lands will be dedicated as they are properly graded and in the plats they are part of. <br />Presuming there is not another substantial economic shock, a new phase per year is <br />anticipated, allowing use of the southerly park lands by 2020, with all new roads being <br />completed by about 2021. <br />Outlot D of River Park is across Highway 40 and has a small Cul de sac for 65' wide lots. <br />Water and access is available, but sewer is preferred to be part of a larger lift station <br />planned to serve the land to the east when the time is appropriate. It is relevant to plan <br />those lands under similar ownership to manage project certainty and design for the <br />known issues of ponding, public roads, etc. <br />III. NATURAL RESOURCES <br />A. Wetland Delineation confirmation <br />Sambatek has field verified prior boundaries that were plotted previously. Areas in Phase <br />one have concurrence from City regulators for a fill permit to be submitted as a separate <br />action for the required road connection of Edison. Mitigation is provided for on site. <br />Wetlands on Phase III lands between proposed Johnson Street and Ivanhoe Drive have <br />been plotted similar to the previous master plan approvals, but will be reviewed in the <br />spring of 2016. They were farmed as permitted over the last several years and will have a <br />recertified boundary assigned by the City as part of a separate review. That boundary <br />will only confirm the setbacks to wetland impacted the proposed lots to the north. That <br />boundary does not affect buildability, only lot pad size. <br />B. Soil and Groundwater <br />The soils are free draining fantastic for home building, may have several zones capable of <br />crushing on site for road base to minimize import trucking near existing home sites and <br />will allow for infiltration per current goals of water resource planning. Groundwater <br />recharge is enhanced from prior calculations, but is substantially similar to the previous <br />master plan. Most of Phases one to four drain to the north, the balance to the south. <br />C. Existing Trees <br />Existing tree cover exists throughout the phase three lots of Johnson and Ivanhoe Drive. <br />Back yard areas will be preserved for quality with trees in the road and front yards <br />through home pads removed per City standards. Deadfall will be removed. Fill of about <br />5' over existing ground elevations is required on Johnson Street to provide proper <br />5160 Viking Blvd. NW <br />Anoka, MN <br />(763)753-6176 <br />