My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.6. ERMUSR 03-15-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2016
>
03-15-2016
>
2.6. ERMUSR 03-15-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 10:19:25 AM
Creation date
3/15/2016 10:19:23 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Completion: <br /> a. Participate in Engineer's visits to the Site to determine Substantial Completion, <br /> assist in the determination of Substantial Completion and the preparation of a <br /> punch list of items to be completed or corrected. <br /> b. Participate in Engineer's final visit to the Site to determine completion of the Work, <br /> in the company of Owner and Contractor,and prepare a final punch list of items to <br /> be completed and deficiencies to be remedied. <br /> c. Observe whether all items on the final list have been completed or corrected and <br /> make recommendations to Engineer concerning acceptance and issuance of the <br /> notice of acceptability of the Work. <br /> C. The RPR shall not <br /> 1. Authorize any deviation from the Contract Documents or substitution of materials or <br /> equipment(including`or-equal"items). <br /> 2. Exceed limitations of Engineer's authority as set forth in the Contract Documents. <br /> 3. Undertake any of the responsibilities of Contractor,Subcontractors.Suppliers,or <br /> Contractor's superintendent. <br /> 4. Advise on, issue directions relative to,or assume control over any aspect of the means, <br /> methods,techniques,sequences or procedures of Contractor's work. <br /> 5. Advise on, issue directions regarding,or assume control over security or safety <br /> practices, precautions,and programs in connection with the activities or operations of <br /> Owner or Contractor. <br /> 6.. Participate in specialized field or laboratory tests or inspections conducted off-site by <br /> others except as specifically authorized by Engineer. <br /> 7. Accept Shop Drawing or Sample submittals from anyone other than Contractor. <br /> 8. Authorize Owner to occupy the Project in whole or in part. <br /> SC-15.01.13 Applications for Payments <br /> Add the following language at the end of Paragraph 15.01.8.1: <br /> Supporting documentation to accompany each Application for Payment shall include: <br /> a. Updated Project Schedule. <br /> b. Updated list showing current status of submittals. <br /> c. Documentation showing payment by Contractor for materials and/or equipment <br /> stored. <br /> d. Documentation showing insurance coverage for materials and/or equipment stored. <br /> e. Red line of all modifications to plan set up to date. <br /> Revised per Addendum 3-Supplementary Conditions <br /> ELKMU 134310 007300-7 <br /> 113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.