8. Review of Work and Rejection of Defective Work: <br /> a. Conduct an-Site observations of Contractors work in progress to assist Engineer in <br /> determining if the Work is in general proceeding in accordance with the Contract <br /> Documents. <br /> b. Report to Engineer whenever RPR believes that any part of Contractor's work in <br /> progress is defective,will not produce a completed Project that conforms generally <br /> to the Contract Documents,or will imperil the integrity of the design concept of the <br /> completed Project as a functioning whole as indicated in the Contract Documents, <br /> or has been damaged,or does not meet the requirements of any inspection,test or <br /> approval required to be made;and advise Engineer of that part of work in progress <br /> that RPR believes should be corrected or rejected or should be uncovered for <br /> observation,or requires special testing,inspection or approval. <br /> 9. Inspections, Tests,and System Startups: <br /> a. Verify that tests,equipment,and systems start-ups and operating and maintenance <br /> training are conducted in the presence of appropriate Owner's personnel,and that <br /> Contractor maintains adequate records thereof, <br /> b. Observe, record, and report to Engineer appropriate details relative to the test <br /> procedures and systems start-ups. <br /> 10. Records: <br /> a. Prepare a daily report or keep a diary or log book,recording Contractor's hours on <br /> the Site, Subcontractors present at the Site,weather conditions,data relative to <br /> questions of Change Orders,Field Orders,Work Change Directives,or changed <br /> conditions,Site visitors,deliveries of equipment or materials,daily activities, <br /> decisions,observations in general,and specific observations in more detail as in <br /> the case of observing test procedures;and send copies to Engineer. <br /> b. Record names,addresses,fax numbers,e-mail addresses,web site locations,and <br /> telephone numbers of all Contractors,Subcontractors,and major Suppliers of <br /> materials and equipment. <br /> c. Maintain records for use in preparing Project documentation. <br /> 11, Reports: <br /> a. Furnish to Engineer periodic reports as required of progress of the Work and of <br /> Contractor's compliance with the Progress Schedule and schedule of Shop <br /> Drawing and Sample submittals. <br /> b. Draft and recommend to Engineer proposed Change Orders,Work Change <br /> Directives,and Field Orders.Obtain backup material from Contractor. <br /> c. Immediately notify Engineer of the occurrence of any Site accidents,emergencies, <br /> acts of God endangering the Work,delay events,damage to property by fire or <br /> other causes,or the discovery of any Constituent of Concern or Hazardous <br /> Environmental Condition. <br /> 12. Payment Requests:Review applications for payment with Contractor for compliance <br /> with the established procedure for their submission and forward with recommendations <br /> to Engineer,noting particularly the relationship of the payment requested to the <br /> Schedule of Values,Work completed,and materials and equipment delivered at the Site <br /> but not incorporated in the Work. <br /> 13. Certificates, Operation and Maintenance Manuals;During the course of the Work,verify <br /> that materials and equipment certificates,operation and maintenance manuals and <br /> other data required by the Contract Documents to be assembled and furnished by <br /> Contractor are applicable to the items actually installed and in accordance with the <br /> Contract Documents,and have these documents delivered to Engineer for review and <br /> forwarding to Owner prior to payment for that pail of the Work. <br /> Supplementary Conditions-Revised per Addendum 3 <br /> 00 7300-6 ELKMU 134310 <br /> 112 <br />