Laserfiche WebLink
safety and traffic flow. This appeared to be a sticking point with the convenience <br /> • center developer. <br /> A compromise was reached where the safety and traffic flow integrity are not <br /> compromised. The convenience center will now be developed as two separate <br /> buildings on the same lot. This will allow the construction of the 20,000 square <br /> foot project to move forward and the convenience store customers enjoy good <br /> access. The medians will be constructed as proposed. A copy of the revised site <br /> plan is included in the agenda packet. The project is expected to move forward <br /> and, site preparation and drainage activities are currently underway. <br /> Ideally, staff would like to see a manufacturing company move to this area so this <br /> component of the Business Park starts to take shape as well. <br /> s:eda/document/edagmm <br /> • <br /> • <br />