My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.0.-9.A. EDSR 06-10-1996
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1996
>
06-10-1996
>
9.0.-9.A. EDSR 06-10-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 4:13:24 PM
Creation date
3/1/2016 4:13:21 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/07/96 09:03 $612 559 2202 BA LIESCH Z 004/004 <br /> • • An underground storage tank may be located in the vicinity of the southwest corner of the building <br /> at 812 Main Street. <br /> Underground storage tank removal $2000 <br /> Subtotal (note: if a leak is present in the tank and contamination has $2000 <br /> occurred additional funds would be involved) <br /> The following is a total of all the above subtotals. <br /> Asbestos surveys and asbestos removal, including laboratory costs $10,626.71 <br /> Removal, transportation and disposal of two ASTs and heating oil $2132 <br /> Removal, transportation and disposal of the x-ray machine, film processing $2370 <br /> equipment and chemicals <br /> Removal, transportation and disposal of all PCB containing light ballasts $ 840 <br /> and fluorescent bulbs <br /> Removal, transportation, and recycling of freon in three air conditioning $1500 <br /> units <br /> Removal of cleaners, lubricants and paint cans located at 812 Main Street NC <br /> • UST removal $2000 <br /> TOTAL $19,468.71 <br /> The above represents a preliminary cost estimate to complete recommendations identified in Section 6.0 <br /> of the Phase One Environmental Site Assessment-812 Main Street, 307 and 317 King Avenue,EIk River, <br /> Minnesota. Please note at this time Liesch is unable to provide an accurate cost estimate for the asbestos <br /> abatement at 317 King Avenue and 812 Main Street until the asbestos survey is completed. Additionally, <br /> cost estimates associated with removal of lead sheeting will be developed once it is determined if any lead <br /> sheeting is present. A more detailed cost proposal can be provided upon request. Please contact me with <br /> any questions you may have. Thank you. <br /> Sincerely, <br /> B.A. LIESCH ASSOCIATES, INC. <br /> -44/a14/1,2- (....1(5A7171Z/dit't <br /> Suzanne Johson <br /> smj:61896/estmt.wp <br /> • <br /> B.A.LIESCH ASSOCIATES. INC. 13400 15TH AVENUE NORTH MINNEAPOLIS,MINNESOTA 55441 <br />
The URL can be used to link to this page
Your browser does not support the video tag.