My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.0.-9.A. EDSR 06-10-1996
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1996
>
06-10-1996
>
9.0.-9.A. EDSR 06-10-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 4:13:24 PM
Creation date
3/1/2016 4:13:21 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/07/96 09:02 12612 559 2202 BA LIESCH 21 002/004 <br /> • <br /> LIEXH <br /> B.A.LIESCH ASSOCIATES,INC. 13400 15TH AVE.N. MINNEAPOLIS,MN 55441 612/559-1423 FAX:612/559-2202 <br /> June 6, 1996 <br /> Mr. Steve Rohlf <br /> The City of Elk River <br /> 13065 Orono Parkway <br /> Elk River, MN 55330 <br /> RE: Phase I Environmental Site Assessment- 812 Main Street, 307 and 317 King Avenue, Elk River, <br /> Minnesota <br /> Dear Steve: <br /> As you requested, Liesch has put together a preliminary cost estimate to address the bullet items listed in <br /> Section 6.0 of the above referenced report. Each bullet item is listed in the following section and is <br /> accompanied by a cost explanation as appropriate. <br /> • Complete the asbestos containing materials survey to comply with NESHAPS requirements. <br /> • Employ a licensed asbestos contractor to remove friable asbestos containing materials in accordance <br /> with NESHAPS requirements. <br /> 307 & 317 King Avenue Asbestos Survey Costs are included in the May $4126.71 <br /> 31, 1996 Liesch invoice along with the costs for the Phase I Environmental <br /> Site Assessment referenced above. This number is the invoice total. <br /> Asbestos report for 307 & 317 King Avenue $ 500 <br /> Asbestos survey and report 812 Main Street $1000 <br /> Asbestos abatement 307 King Avenue $3000 <br /> Asbestos abatement 317 King Avenue and 812 Main Street - unknown at unknown <br /> this time - survey completion and laboratory results needed <br /> Laboratory costs $2000 <br /> Subtotal • $10,626.71 <br /> • Decommission and remove the fuel oil tanks. <br /> Removal of two 265 Gallon aboveground storage tanks $1800 <br /> • Disposal of heating oil (estimating 132.5 gallons) $ 332 <br /> Subtotal $2132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.