My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. EDSR 03-08-1999
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1999
>
03-08-1999 SPECIAL
>
3.0. EDSR 03-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 11:17:22 AM
Creation date
2/23/2016 11:02:48 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
3/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority #4 <br /> Downtown Redevelopment <br /> • Attract Reinvestment in the Elk River Central Business <br /> District (CBD) <br /> •► Overall CBD Design <br /> ✓ Identify the criteria and scope of a Focus Study of the physical <br /> elements of the CBD, including elements of the riverwalk concept <br /> ✓ Bring in an outside consultant, if determined necessary, to <br /> complete the Focus Study within the scope identified <br /> ✓ Examine criteria for additional HRA programs which may provide <br /> incentives to property owners to implement the results of such a <br /> Focus Study i.e., signage improvement program, CBD marketing <br /> program, partnerships with local banks, building rehabilitation <br /> program <br /> ✓ Review the zoning and land use plan for the CBD as part of a <br /> Focus Study to determine if changes are appropriate <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.