My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. EDSR 03-08-1999
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1999
>
03-08-1999 SPECIAL
>
3.0. EDSR 03-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 11:17:22 AM
Creation date
2/23/2016 11:02:48 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
3/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Priority #3 <br /> East Hwy. 10 <br /> Development/Redevelopment <br /> • Redevelop the East Highway 10 Corridor <br /> ✓ Establish the criteria for identification of redevelopment areas within <br /> and outside the Urban Service Boundary along east Highway 10 <br /> ✓ Identify and prioritize these east Highway 10 redevelopment areas <br /> ✓ Establish a plan to redevelop and market each of these prioritized <br /> areas coordinating efforts with the proposed transportation corridor <br /> connecting County Roads 12/13 and Highway 10 <br /> ✓ Inventory property owners within these redevelopment areas and <br /> discuss possible "Joint Development Agreements", and other <br /> • cooperative efforts which could be undertaken to aid in <br /> development of these areas <br /> ✓ Establish a long term design and land use plan which might include <br /> establishing a uniform design theme for the overall area utilizing <br /> some of the elements of the central business district Focus Study <br /> (when completed) <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.