Laserfiche WebLink
,--(./ A <br /> ityof <br /> .lk • <br /> River <br /> Elk River Entrance Monument - Task Outline <br /> 1. General Contractor requirements <br /> a) Bonded with city <br /> b) Liability and workers comp insurance <br /> 2. General Contractor responsibilities <br /> a) Bid sign and landscaping <br /> i) Sealed quote <br /> ii) Itemize tasks <br /> iii) Find and coordinate donations of materials and labor <br /> • Sign and concrete base <br /> • Metal letters <br /> • Lights <br /> • Boulders for wall and pillar <br /> 0 • Landscaping <br /> b) Itemize donations and donors for public recognition <br /> c) Confirm location of sign with City staff <br /> d) Schedule of work, July 4th deadline <br /> 3. Details <br /> a) Grading <br /> i) Raise grade +/- 3 ft to accommodate sign <br /> b) Metal letters and elk head <br /> i) Select paint colors <br /> ii) Constructed so not easily vandalized <br /> iii) Determine how letters will be attached <br /> c) Concrete Sign <br /> i) Concrete color and texture <br /> ii) Concrete texture <br /> d) Boulder Post <br /> i) Rock detail <br /> ii) Cap detail <br /> iii) Footing detail <br /> e) Boulder Landscape Wall <br /> i) Determine quantity of boulders and size <br /> 0 ii) Fabric behind wall <br /> f) Landscaping <br /> \\elkriver\sys\shrdoc\planning\stevewen\ermsn.doc <br /> 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612) 441-7420 • Fax: (612)441-7425 <br />