Laserfiche WebLink
7 Option B <br /> Common Excavation $900.00 <br /> Foundation-piers with a grade beam $2,400.00 <br /> Cast in place concrete backdrop $4,650.00 ,\ <br /> Painted metal lettering and logo $3,800.00 t <br /> Stone clad pier with precast cap $3,050.00 <br /> (3) uplights $1,400.00 <br /> Dry laid boulder wall $1,350.00 <br /> Planting $1,625.00 <br /> • <br /> Subtotal $19,175.00 <br /> 10% Contingency $1,917.50 <br /> 1 <br /> Total Preliminary Cost Estimate- Option B $21,092.50 l <br /> 411 1 <br /> 0 • <br />