My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 PCSR 01-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
01-26-2016
>
8.1 PCSR 01-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 12:36:18 PM
Creation date
1/22/2016 12:34:28 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/26/2016
case
CU 16-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODERN <br /> CDNSTRUCTIDN <br /> 12/28/2015 <br /> Site Sketch Addendum Sheet <br /> Prepared by Jesse Hartung <br /> Ecology Project XXX Yale CT <br /> The following notes help to clarify the proposals highlighted on the site sketch. <br /> Land swap: <br /> Modern Construction is requesting a land swap between the City of Elk River and Modern Construction in which 4.5 acres of land <br /> along the Mississippi as highlighted in the blue dotted lines on the site sketch would be exchanged for the less than 1 acre of land as <br /> highlighted by the,green dotted lines on the site sketch. This would provide the city with an access road and ample land to a gently <br /> slopped Mississippi shoreline with ample room to install picnic tables and other various park amenities.Modern Construction would <br /> receive the building pad needed for the Ecology project as well as an easement for the road to gain access to the remaining shoreline. <br /> The City of Elk River would construct the future road and Modern would construct the public parking garage and trails along road. <br /> The Land swap and platting would happen in the following manner: <br /> -Acquire the red dotted line area to provide for future public parking area(constructed and maintained by Modern) <br /> -Re-platting the yale ct property to remove the future road extension area and extend the building site in dotted red area <br /> -Execution of the land swap for the remaining land <br /> -Construction of the Ecology project to full exterior completion <br /> -Construction of the future yale ct extension <br /> -Competed construction of Ecology project <br /> This order provides the most feasible manner in which the Ecology project and future road extension can be completed without <br /> potential damage to either project and allowing for the safest and securest construction on both projects. <br /> Setbacks&Easements: <br /> 3'building setback from the future road extension to provide for a sidewalk,this allows the building to best sit on the land <br /> Roadway access easement so Ecology residents and guests can access the private shoreline property <br /> Access easement for potential future ramp to second story street level parking if needed as highlighted by solid green lines <br /> MODERNCONSTRUCTiEINMN.COHM <br /> 621 MAIN ST NW, ELK RIVER, MN 55330 P: 763.200.6376 I F: 866.259,8354 I E. INFO @MODERNCONSTRUCTIDNMN.CDM <br />
The URL can be used to link to this page
Your browser does not support the video tag.