My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 01-04-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
01-04-2016
>
7.3. SR 01-04-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:04:53 AM
Creation date
12/31/2015 12:29:16 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/4/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br />ver <br />To: Planning Department <br />From: Justin Femtite, P.E., City Engineer <br />Date: 12-8-2015 <br />Subject: Site Plan Review Meeting — December 7, 2015 <br />The department listed above has reviewed the application(s) listed below and has the followingcomments: <br />Case # CU 15-23, V 15-15 — Elk River School District #7281 • The identified truck turning movements interfere with proposed parking spaces. This isnotadequate. <br />2• When discussing the project with the architect prior to this submittal, we spoke of theneedtoshowaninterimparkingplanthatwillbeuseduntilthefull "west lot" isreconfigured (now indicated to be 2017). This shall include restriping of displacedparkingstallsincloserproximitytotheicearena. Maintaining the existing conditionsandlayoutforparkinginthe "west lot" is not sufficient. 3. At various planning meetings we have indicated the entrance of the access road, whichgoesbetweentheproposedadditionandtheicearena, should be reconfigured. It is hardtounderstandwhythecurbsarebeingputinonlytorequiretwosharp90degreemovements. It is further difficult to understand how this new configuration might thentieintoafinallayoutforthe "west lot" in 2017. This should be revised to provide betterflowandbesetuptomaximizeparkingandoperationalflowofthe "west ice,. 4• We have had some discussions with your traffic engineer but have yet to receive a finalreportshowingwhatwillhappentotrafficflowresultingfromthedisconnectionoftheexistingnorthlanearoundtheschool. Preliminary discussions included the possibleneedtoaddaleftturnsignaltothetrafficsignalsystemonSchoolStreetforeastboundtonorthboundmovementsintothelot. If this is still the case, the project submittalshouldreflectmakingthisimprovement.
The URL can be used to link to this page
Your browser does not support the video tag.