My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 01-04-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
01-04-2016
>
7.3. SR 01-04-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:04:53 AM
Creation date
12/31/2015 12:29:16 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/4/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum <br />ver <br />To: Planning Department <br />From: Brandon Wisner, Stormwater Coordinator <br />Date: December 8, 2015 <br />Subject: Site Plan Review Meeting— December 7, 2015 <br />The department listed above has reviewed the application(s) listed below and has the followingcomments: <br />Case # CU 15-23, V 15-15 — Elk River School District #7281AsnotedintheAugust7`h, 2015 Site Plan Review: <br />1. In accordance with city Ordinance Section 78-504. Redevelopment projects, on sites withoutrestrictionsthatcreatenewimpervioussurfacesshallcaptureandretainonsite1.1 inches ofrunofffromthenewimpervioussurfaceandshowanetpollutantreductionforanyreconstructedimpervioussurfaces. <br />quality report is also needed. A maintenance schedule for2. If disturbance is one acre or more, an issued NPDES permit is required. A MIDS water <br />long term maintenance is requiredforpermanentBMPs. Inlet protection and sediment perimeter control is needed downgradientofproposedconstruction. Also, <br />1. This site is within 1 mile of an impaired waterbody so stabilization needs to occur in 7 daysforareasthatarenotbeingactivelyworked. ZT-. L - .-- - ...
The URL can be used to link to this page
Your browser does not support the video tag.