My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.3. SR 01-04-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
01-04-2016
>
10.3. SR 01-04-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:00:55 AM
Creation date
12/31/2015 12:27:08 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/4/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September, 2014 Through the State Corridors of Commerce solicitation, the city submitted three <br />projects for consideration: installation of adaptive signal controls along TH 10 and <br />TH 169, preliminary design for new ramps at the TH 10/101/169 Interchange and <br />design of and right-of-way acquisition for interchange on TH 10/169 at a future <br />extension of Twin Lakes Road (south of 167th Avenue Per FAST study). <br />April, 2015 <br />Testified before state legislative committees on bills introduced by Senator Kiffineyer <br />for the funding of a new interchange at TH 10/101/169 and installation of adaptive <br />controls along the TH 10 and TH 169 corridors in Elk River. Attachment 5 & 6 <br />October, 2015 <br />Took direction from City Council to study traffic flow and make recommendations <br />for mobility improvements in the Line Avenue, Main Street, Zane Street Area. <br />Attachment 7 <br />December, 2015 <br />Began design concepts for mobility improvements at the CSAH 1 and TH 10 <br />intersection as part of the 2017 Street Improvement project. <br />December, 2015 <br />Attended the kickoff meeting for the Metropolitan Council's Principal Arterial <br />Intersection Conversion Study. This study, expected to last 12-18 months, will <br />prioritize the needs for interchanges throughout the entire metro region. <br />Attachment 8 <br />Staff will walk through the above timeline and associated work involved. We will be looking for direction <br />on future efforts the Council would like to see made. <br />Financial Impact <br />No financial impact. <br />Attachments <br />■ 171" Avenue FAST Study Transportation Map, 1 Page <br />■ Downtown TH 10 Geometric Layout Map, 1 Page <br />■ TH 169 Geometric Layout Maps, 5 Pages <br />■ Chamber of Commerce Recommendations, 1 Page <br />■ Summary of TH 10/101/169 Interchange, 2 Pages <br />■ Summary of Adaptive Signal Controls, 2 Pages <br />■ Main Street, Zane Street, Line Avenue Area Figure, 1 Page <br />■ Principal Arterial Intersection Conversion Study, 5 Pages <br />N:\Public Bodies\Agenda Packets\01-04-2016\Fina1\x10.3 sr Transportation Update.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.