Laserfiche WebLink
<br />Task 3.4 95% Construction Documents – Coordinating with the City and our team of A/E sub-consultants, Spohn <br />Ranch will incorporate feedback from the 80% review meeting and prepare the 95% construction document <br />package. If necessary, 95% submittal will include an updated cost estimate. <br />Task 3.5 95% Construction Documents Review – City staff will review the 95% Construction Documents submittal <br />and prepare redline comments. Spohn Ranch and City staff will discuss via teleconference the redline comments <br />and identify actions needed to address the comments. <br />Task 3.6 100% Construction Documents – Coordinating with the City and our team of A/E sub-consultants, Spohn <br />Ranch will incorporate feedback from the 95% review meeting and finalize the 100% construction document <br />package. 100% submittal will include required stamps and signatures. The final construction document package is <br />typically delivered to the client in the following formats: <br /> Compact disc with digital PDF files <br /> 2D AutoCAD base file <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />