My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.6. SR 12-21-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
12-21-2015
>
7.6. SR 12-21-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 11:19:42 AM
Creation date
12/18/2015 11:19:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br />2016 Utilities Fee Schedule <br />Proposed Fee Schedule <br />Fee Description 2015 <br />Proposed Proposed <br />2016 Increase <br />1 New Residential Electric Connection-Developer-Lot with ERMU water service 475.00 $ 475.00 <br />2 New Residential Electric Connection-Developer-Lot without ERMU water service 575.00 $ 575.00 <br />3 New Residential Electric Connection-Builder 875.00 $ 875.00 <br />4 New Wire Footages over 200'(per foot) 4.00 $4.00 <br />5 New Service Frost Trenching(per foot) 5.00 $5.00 <br />6 New Commercial&Industrial Electric Connection 50% 50% <br />7 Service Upgrades or Additions for Existing Customers 100% 100% <br />8 Minimum Temporary Electric Service Fee-Existing Transformer 150.00 $ 150.00 <br />9 Minimum Temporary Electric Service Fee-Without Existing Transformer 500.00 $ 500.00 <br />10 Street Light-30'Decorative Pole with 6'Arm and Fixture 1,850.00 $ 1,850.00 <br />11 Street Light-23'Decorative Pole with Traditionaire Fixture 1,500.00 $ 1,500.00 <br />12 Security Light-Wood Pole with Fixture 975.00 $ 975.00 <br />13 Security Light-Existing Pole 125.00 $ 125.00 <br />14 Pole Attachment Fee(per pole) 6.50 $6.50 <br />15 <br />16 Water Access Charge=Water Connection Charge+Water Availability Charge 3,325.00 $ 3,425.00 3.01% <br />17 Water Connection Charge(Per Plumbing Unit)-Builder 3,000.00 $ 3,090.00 3.00% <br />18 Water Availability Charge(Per Plumbing Unit)-Developer 325.00 $ 335.00 3.08% <br />19 Abandoned Water Service 2,500.00 $ 2,500.00 <br />20 Hydrant Water Sales-Rental(per week) 50/week $50/week <br />21 Hydrant Water Sales-Units(per 1000 gallons) 4.00 $4.00 <br />22 Deposit for 5/8"Hydrant Meter 150.00 $ 150.00 <br />23 Deposit for 2 1/2"Hydrant Meter 1,000.00 $ 1,000.00 <br />24 Private Hydrant Maintenance Program Monthly Fee 5.00 $5.00 <br />25 <br />26 NSF Fee 30.00 $ 30.00 <br />27 Red Tag Handling Fee 20.00 $ 20.00 <br />28 Administrative Fee for Continued Submission of Checks After No-Check Notice Given 20.00 $20.00 <br />29 Penalty Amount 10% 10% <br />30 Electric Service Disconnect Fee-Meter Technician 50.00 $ 50.00 <br />31 Electric Service Disconnect Fee-Line Crew 150.00 $ 150.00 <br />32 Water Shut-Off Fee 100.00 $ 100.00 <br />33 Meter Tampering Fee 250.00 $ 250.00 <br />34 Meter Testing Fee 50.00 $ 50.00 <br />35 Energy Audit 50.00 $ 50.00 <br />36 <br />37 Billable Cost of Materials Markup 15% 15% <br />38 Billable Labor Markup 55% 55% <br />39 Billable Vehicle/Equipment(per employee per hour) 30.00 $ 30.00 <br />40
The URL can be used to link to this page
Your browser does not support the video tag.