Laserfiche WebLink
Exhibit B <br />Elk River- Municipal utilities <br />2416 Utilities Fee Schedule <br />Adopted by the Utilities Commission on October 13, 2015 under authority per Minnesota Statute 412.361 <br />Fee Description 2016 <br />1 New Residential Electric Connection-Developer-Lot with ERMU water service 475.00 <br />p2NewResidentialElectricConnection- Developer-Lot without ERMU water service 575,00 <br />3 New Residential Electric Connection-Builder 875.00 <br />4 New Wire Footages over 200'(per foot) 4.00 <br />5 New Service Frost Trenching(per foot) 5.00 <br />6 New Commerciale. Industrial Electric Connection 50% <br />7 Service Upgrades or Additions for Existing Customers 100% <br />8 Minimum Temporary Electric Service Fee-Existing Transformer 150.00 <br />9 Minimum Temporary Electric Service Fee-Without Existing Transformer 500.00 <br />10 Street Light-30' Decorative Pole with 6'Arm and Fixture 1,850.00 <br />11 Street Light-23' Decorative Pole with Traditionaire Fixture 1,500.00 <br />12 Security Light-Wood Pole with (Fixture 975.00 <br />13 Security Light- Existing Pole 125.00 <br />14 Pole Attachment Fee(per pole)6.50 <br />15. <br />16 Water Access Charge=Water Connection Charge+Water Availability Charge 3„425.00 <br />17 Water Connection Charge(Per Plumbing Unit)-Builder 3,090.00 <br />18 Water Availability Charge(Per Plumbing Unit)- Developer 335.00 <br />19 Abandoned Water Service 2,500.00 <br />20 Hydrant Water Sales- Rental(per week) 50/week <br />21 Hydrant Water Sales-Units(per 1000 gallons) 4.00 <br />22 Deposit for 518°.Hydrant Meter 150.00 <br />23 Deposit for 2 112 Hydrant Meter 1,000.00 <br />24 Private Hydrant Maintenance Program Monthly Fee 5.00 <br />25 <br />26 NSF Fee 30.00 <br />27 Red Tag Handling Fee 20.00 <br />28 Administrative Fee for Continued Submission of Checks After No-Check Notice Given 20.00 <br />29 Penalty Amount 10% <br />30 Electric Service Disconnect Fee-Meter Technician 50.00 <br />31 Electric Service Disconnect Fee-Line Crew 150.00 <br />32 Water Shut-Off Fee 100.00 <br />33 Meter Tampering Fee 250.00 <br />34 Meter Testing Fee 50.00 <br />35 Energy Audit 50.00 <br />36 <br />37 Billable Cost of Materials Markup15% <br />38Billable Labor Markup 55% <br />39 Billable Vehicle 1 Equipment(per employee per hour)30.00 <br />4^