My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.12. SR 12-21-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
12-21-2015
>
4.12. SR 12-21-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 11:37:48 AM
Creation date
12/18/2015 11:17:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement for Services <br />This Agreement for Services ("Agreement") is entered into between Veit & Company Inc. ("Contractor") and <br />the City of Elk River ("City") regarding the Houlton Farm outbuilding removal to be performed between <br />December 7, 2015, and July 31, 2016. <br />I/We. Veit Snecialty ContractinLy and Waste ManaLyement, agree to the followin <br />The Contractor has received the Request for Proposal ("RFP' and will comply in all respects with the RFP in the <br />performance of this Agreement. <br />The Contractor shall furnish all supervision, labor, materials, and equipment necessary to accomplish the Houlton Farm <br />outbuilding removal services (the "Work") as specified in the RFP. The Work is to be completed by July 31, 2016. The <br />hours of operation will be weekdays from 7:00 a.m. to 7:00 p.m. <br />The Contractor is responsible for all permits and compliance with all local, state, and federal building, electrical, safety, <br />waste management, and other codes and laws. <br />The Work includes removal of the Houlton Farm outbuildings and materials as directed in the RFP and any other <br />written communication by the City. If conditions are present that Contractor believes are not within the scope of the <br />RFP, the Contractor will notify the City within 24 hours of assignment and will send bid and photos to request <br />additional considerations. <br />Any damage to the property caused by the Contractor shall be repaired by the Contractor. <br />All junk and debris removed are to be properly disposed of by the Contractor off of the property location in compliance <br />with all applicable regulations and City standards. All receipts and load tickets must be furnished to the City upon <br />completion. <br />Erosion control and dust elimination measures on the property shall be used. <br />Safety <br />Safety of the Contractor is a first priority. The Contractor understands its obligation to inform the City and remove <br />itself from an unsafe situation due to threats, hazardous materials, or similar situation. All safety and security measures <br />will be put in place by the Contractor. <br />Insurance <br />Any changes to the workers compensation and general liability insurance, (i.e., carrier, coverage term/amounts) provided <br />in Contractor's response to the RFP must be submitted in writing to the City. <br />Billing <br />The accepted bid was for award to demolish all buildings and removal of foundations and seeding for all buildings. The <br />Not to Exceed price was for $41,084. After completing authorized work, any invoices, documentation, reports, and <br />pictures should be sent to: <br />City of Elk River <br />Attn: Tim Sevcik <br />13065 Orono Parkway <br />Elk River, MN 55330 or <br />TSevcik@E]kRiverMN.gov <br />Invoices will be submitted to the City Council for payment upon completion. Invoices will not be paid for work <br />completed without a written order. <br />Signatures <br />John J. Dietz, Mayor <br />Tina Allard, City Clerk <br />Veit Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.