My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.5. SR 12-07-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
12-07-2015
>
8.5. SR 12-07-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 10:38:31 AM
Creation date
12/3/2015 3:14:54 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/7/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 Overall Scope of Services <br />The services required of the Consultant are anticipated to be provided beginning in November of 2015 and ending <br />after final acceptance of the skate park plan and construction documents. The selected Consultant shall be the <br />overall project lead and manager on behalf of the City. The Consultant shall report to and take direction from city <br />staff as directed by the City Council. <br />The Consultant's proposal should include a detailed scope and budget estimate for all services as outlined in this <br />RFP. Each element must be broken out as a separate item. <br />The City stresses Consultant's innovation, uniqueness and ingenuity in proposing scope of services. Recommended <br />changes to the scope will be considered and concerns regarding budget and time frames should also be identified. <br />The City proposes a team approach in the development of the design utilizing the services of the Consultant in <br />conjunction with the Parks and Recreation staff, Parks and Recreation Commission, and the Skate Park Committee. <br />Management Services <br />The Consultant will serve as assistant to the Recreation Manager throughout all elements of the skate park design <br />project. Services rendered shall include as a minimum: <br />1. Assistance in defining the maximum utilization of project resources in completing the scope of services, <br />taking into account budget and time frame constraints. <br />2. Assistance in preparing documents, graphics and mapping standards applicable to all. <br />Design and Construction Drawings <br />The Consultant shall: <br />1. Define materials and construction systems for a concrete skate park at Orono <br />2. Design drainage system to take into account the proximity to Orono Lake. <br />3. Develop outline specifications for the scope of the project. <br />4. Review draft and final design development sets with Parks and Recreation staff, the Parks and Recreation <br />Commission and the Skate Park Committee. <br />5. Drawings must include all costs, details, cross section, and profiles necessary to bid the project. <br />6. An additional cost option taking into consideration the reduced cost impact of utilizing donated concrete <br />and labor. <br />Section 4 Proposals <br />The proposal shall contain the type of information summarized below. Additional information is allowable, <br />providing it is directly relevant to the proposed project. <br />Proposal Format <br />The submittal should follow the Table of Contents listed below: <br />1. General Firm Introduction (include your firms expertise on the subject of this project) <br />2. Project Understanding <br />3. Project Approach <br />4. Proposed Project Team and Experience <br />
The URL can be used to link to this page
Your browser does not support the video tag.