My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.0. HRSR 03-10-1998
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
1993-1999
>
1998
>
03-10-1998 SPECIAL
>
2.0. HRSR 03-10-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 2:40:55 PM
Creation date
12/2/2015 2:40:47 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
3/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Actions Strategy 4c <br /> • Extend Walnut Street past River Street to make a direct vehicle Make the Mississippi River an <br /> and pedestrian connection between most of downtown and the integral part of downtown <br /> river. <br /> • Introduce uses along and north of River Street that complement <br /> the park and attract people to the riverfront area. <br /> • Establish guidelines for planting on downtown streets and side- <br /> walks that utilize, to the greatest degree possible, plants that are <br /> a part of Monticello's river and savanna environment. <br /> • Redevelop West Bridge Park to serve as downtown's major <br /> outdoor event space, able to easily accommodate 1000 people <br /> for a single event. <br /> Actions Strategy 4d <br /> • Use the first major public improvement project to study and Make improvements throughout <br /> define the elements that will be used at all downtown streets downtown's public spaces that utilize <br /> and public spaces. consistent patterns,materials and <br /> • Review life cycle costs and efficiencies for all new elements details <br /> introduced into downtown's public spaces before implementa- <br /> tion (for example, the cost of furnishing electricity to lights, the <br /> cost of maintaining street trees, the lifespan and maintenance <br /> costs of a concrete walk). <br /> • Establish a common lighting program for all downtown park- <br /> ing areas(public and private). <br /> . Strategic Outcome <br /> • A downtown that evolves to reflect qualities and character ele- <br /> ments that are appropriate to the Monticello landscape and <br /> community — a downtown that is not a copy, but an original <br /> —and uses elements that endure. <br /> Strategic Target <br /> • Establishment of design guidelines and a review process by <br /> September 1997. <br /> • Implementation of improvements to streets coordinated with <br /> major construction or reconstruction. <br /> • Initiation of enhancement to West Bridge Park in the summer <br /> of 1997. <br /> Strategy 5: A transportation"web" <br /> Actions Strategy 5a <br /> • Develop a network of sidewalks reaching from downtown into Create a range of options for moving <br /> surrounding neighborhoods. into and through the downtown in <br /> • Expand the service provided by the Heartland Express to create order to ease,as much as possible, <br /> a regularly scheduled "local circulator," concentrating service traffic congestion and to encourage <br /> at peak transport hours (such as noon and early evening). people to move between downtown <br /> • Study the feasibility of utilizing the railroad for a local service destinations without their cars <br /> • trolley or linear parkway, with destinations including schools, <br /> downtown and Montissippi Park. <br /> A New Bridge <br /> Ai <br /> Revitalizing Monticrllo's Downtown and Rlverfront <br /> Page 4:29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.