My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.0. HRSR 03-10-1998
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
1993-1999
>
1998
>
03-10-1998 SPECIAL
>
2.0. HRSR 03-10-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 2:40:55 PM
Creation date
12/2/2015 2:40:47 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
3/10/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Strategy 3b Actions <br /> Encourage the highest possible • Require design review of every new development or rehabilita- <br /> density of development within the tion within downtown to ensure conformance to the design <br /> boundaries of downtown guidelines outlined by this plan, especially when such projects <br /> receive city assistance. <br /> • Reduce on-site parking requirements for downtown uses by <br /> allowing on-street parking along a site's public periphery. <br /> • Encourage the development of multi-story buildings in down- <br /> town. <br /> Strategy 3c Actions <br /> Define transition zones at the • Establish land use controls for an area lying generally one <br /> periphery of downtown for uses such block beyond the downtown boundary that will allow for"tan- <br /> as multi-family residential and sition"uses and development. <br /> home-based businesses <br /> Strategic Outcome <br /> • A downtown that is recognized as the center of the Monticello <br /> community due to its built patterns, and one that is interesting <br /> for pedestrians and encourages pedestrian activity on the streets <br /> of downtown. <br /> Strategic Target <br /> • Revised land use controls adopted within one year of accep- <br /> tance of the plan. <br /> Strategy 4: An identity related to Monticello • <br /> Strategy 4a Actions <br /> Build or renovate buildings to create a • Work to identify and understand the community's special char- <br /> relationship to the community as well acter and qualities so that those ideas can be passed on to those <br /> as to their immediate purpose private sector that might contemplate changes to their buildings <br /> or new buildings. <br /> • Require adherence to the design guidelines for all new build- <br /> ings, for all renovations that receive any degree of city assis- <br /> tance and for all other improvements that total more than <br /> $10,000 in value or effect more than one-quarter of a building's <br /> gross floor area or more than 25%of total facade of a building. <br /> • Encourage the creation of buildings that are flexible enough to <br /> accommodate a variety of uses over time, and that are con- <br /> structed with a life span of at least 50 years. <br /> • Mandate that any improvement that requires a building permit <br /> have a building maintenance program submitted and approved <br /> before issuance of a certificate of occupancy. <br /> Strategy 4b Actions <br /> Create public buildings that stand out • Agree upon an architectural style for all public buildings that is <br /> from other downtown buildings but based on character of the community. <br /> that have a common • Place public buildings on sites that are prominent within down- <br /> character and quality town. 411 <br /> AT-=-�A New Bridge <br /> -_--��� Revitalizing Montkello's Downtown and Rivedront <br /> Page 4:28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.