Laserfiche WebLink
Area #1 Interconnection Plan <br /> Overview <br /> This document will cover distribution interconnections that are needed to <br /> accommodate Elk River Municipal Utility's (ERMU) acquisition of Connexus <br /> Energy (CE) territory and plant in Area#1. This document also fulfills the <br /> requirements of Section 2.8 of the Electric Service Territory Agreement dated <br /> March 20, 2015. <br /> Two interconnections are needed as part of the Area #1 acquisition: <br /> 1. An interconnection along U.S. Highway 10, which is referred as the "Credit <br /> Union Interconnection". <br /> 2. An interconnection to Anoka circuit 5 located which is referred as the <br /> "County Road 12 Interconnection". <br /> Details for each interconnection are outlined on the attached pages. <br /> CE and/ RMU agree to this Area #1 Interconnection Plan. <br /> Mike Rajala, EO Tr oy Adams, General Manager <br /> Connexus Energy Elk River Municipal Utility <br /> 47,27po 6 /1-tizepl5-- <br /> Date Date <br /> 76 <br />