Laserfiche WebLink
topographic information would be gathered in the second phase. It would show the existing <br />library building and parking area, as well as the existing homes and topographic features on <br />the two lots to the west of the library proper. A copy of the final drawing would be <br />provided electronically. Total cost for this phase of the work would be $3,300.00. Total <br />cost for the entire library sire including the boundary and topographic survey would be <br />$7,300.00. <br /> <br />Both of these cost estimates represent the maximum cost for each phase and would not be <br />exceeded. They do, however, assume that both sites would be authorized to proceed at the <br />same time, gaining some economies of scale relative to the research and fieldwork necessary <br />to complete the scope of services. We are prepared to begin work on these sites as soon as <br />authorization is given and would expect that the electronic versions of the data for both sites <br />would be available to the City within 60 days. <br /> <br />If you have any questions regarding this information or would like any more detail about any <br />specifics contained within this proposal, please call. <br /> <br />Sincerely, <br /> <br />HOWARD R.. GREEN COMPANY <br /> <br />S:\PLANN1NG\Terry Maurer\Street-Library projects.doc <br /> <br /> <br />