Laserfiche WebLink
Howard R, Green Company <br /> <br />August 10, 2004 <br /> <br />F~e: 230000M-0325 <br /> <br />Ms. Michele McPherson <br />Director of Planning <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, Minnesota 55330 <br /> <br />STREET DEPARTMENT AND LIBRARY SITE <br />BOUNDARY AND TOPOGRAPHIC SURVEYS <br /> <br />Dear Ms. McPherson: <br /> <br />As requested, we have prepared this proposal to provide a boundary survey, wetlands <br />delineation, and topographic survey at the current Street Department property and a <br />boundary and topographic survey at the current Library site. Attached are two exhibits <br />which show the area included in the proposal. <br /> <br />At the Street Department site the scope of work would be a boundary survey including all <br />necessary research and fieldwork to establish the perimeter of the site and replace any iron <br />pipe monuments that are not found in the proper locations in the field. The boundary <br />fieldwork would then be sent to the office for computations and preparation of a site <br />boundary certificate. The total cost for this work would be $7,100.00. <br /> <br />The second step would be the initial wetland delineation by our certified wetland person. <br />The survey crew would then pick up the delineation markers so that they could be shown on <br />the topographic drawing and an initial wetland delineation report would be prepared. It <br />should be noted that at this time, this item does not include a wetland mitigation plan since <br />the extent of wetland impacts will not be know. The total cost for this phase of the work <br />would be $3,200.00. <br /> <br />The final portion of the work at the Street Department site would be to do the fieldwork to <br />pick up the topographic contours of the site and then prepare a drawing using the boundary <br />survey as a base. The frnal drawing showing the topographic information, wetland <br />boundaries, and boundary survey would be submitted to the City electronically. The total <br />cost of this portion of the project would be $7,000.00. All three portions of the scope of <br />services at the Street Department site combined would be $17,300.00. <br /> <br />At the Library site, the boundary survey would again include the necessary research and field <br />work to establish the locations and place missing iron pipe monuments. This information <br />would then again be submitted to the office and a boundary survey certificate would be <br />prepared. Total cost for the Library site for this phase of the work would be $4,000.00. The <br /> <br /> S:\PLANNING\Teny Maurer\Street-Library projects.doc <br /> <br />2550 University Avenue West · Suite 400N · St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />