My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 08-16-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
08/16/2004
>
5.3. SR 08-16-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:54 AM
Creation date
8/13/2004 1:02:48 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODEL #2 <br /> EXHIBIT A <br />A~reement between the Parties <br /> <br />SAMPLE <br /> <br />I. Identify Construction Sites <br />A. The local governmental unit (LGU) will identify all active construction sites that disturb <br /> more than one acre within its jurisdiction. <br /> <br />II. Determine Which Sites Have Permits <br />A. Among the sites identified above, the LGU will determine which sites have obtained an <br /> NPDES Stormwater Permit for Construction Activity and which have not. The LGU shall <br /> advise non-permitted sites to cease construction work until permit coverage has been <br /> obtained and shall refer the case to the MPCA for enforcement action. <br /> <br /> III. Conduct Stormwater Compliance Inspections <br />A. The LGU will perform field inspections on all sites that disturb one acre or more to <br /> determine if the required Stormwater Pollution Prevention Plan (SWPPP) is on site and being <br /> followed and that the Best Management Practices are in place and working. <br />B. The LGU will respond to complaints coming into the MPCA or into the local jurisdiction and <br /> follow up on complaints by conducting field inspections of the site to determine compliance <br /> with local and MPCA stormwater regulations. <br />C. The LGU will complete an inspection report form for each site recording deficiencies, <br /> violations and recommendations for corrective action, and distribute copies accordingly. <br />D. The LGU, when necessary, will exercise local ordinance requirements and or local <br /> enforcement action or authority for sites that do not comply with NPDES permit <br /> requirements, up to and including issuing stop work orders. <br />E. If an inspection reveals noncompliance or serious environmental harm to surface waters, the <br /> LGU will refer the case to the MPCA for enforcement action. <br />F. The Department will record all information regarding inspections, violations, and follow-up <br /> actions electronically (including those successfully resolved), and will transmit the data to <br /> the MPCA on a monthly basis. <br /> <br />IV. Inter-iurisdictional Coordination <br />A. The LGU will make contacts at the watershed level so that local activities can be &oordinated <br /> with the Iong-term efforts of the watershed district. The Department will document these <br /> efforts, and will report this information to the MPCA. <br /> <br />V. Develop a Communication Plan with the MPCA <br />A. The LGU will transmit data and information to the MPCA on a monthly basis during the <br /> period of this Agreement, or as otherwise agreed upon in advance by the parties. <br />B. The LGU will work closely with the assigned MPCA staff in coordinating activities. <br />C. The Department and the MPCA will meet monthly (or as otherwise agreed upon in advance <br /> by the parties) to discuss implementation of this agreement. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.