My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2000 CC MIN
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2000-2009
>
2000
>
09-25-2000 CC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:52 AM
Creation date
7/12/2004 7:30:49 PM
Metadata
Fields
Template:
City Government
type
CCM
date
9/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes <br />September 25, 2000 <br /> <br />Page 4 <br /> <br />· Deregulation <br />· Gas turbine proposals <br />· Utility rates <br /> <br />Couneilmember Thompson diseug~ad fha i~ue of regidanfg havino fo pay mor~ for <br />an electric connection in the winter as opposed to the summer because the <br />homeowner has to dig their own trench in the winter to lay the line os opposed to <br />the Utilities digging the trench in the summer. <br /> <br />Councilmember Dietz indicated that he feels it is a good idea to have a council <br />representative sit on the Utilities Commission as it opens up communication <br />between the two groups. <br /> <br />4.4. City En,qineer Update on Projects <br /> <br />City Engineer Terry Maurer updated the Council on the current status of the <br />following projects: ~ <br /> <br />· Signals on County Road 1 at School Street and County Road 77 <br />· No Parking Signage and Crosswalk at East Side of Lowell Avenue on Main <br /> Street <br />· Business Center Drive/Waco Street <br />· Holt/Irving Sewer Main Lining <br />· Highway 169/County Road 33 Signal (temporary) and Interchange <br /> Projects for 2003 <br />· East Elk River Improvement Project <br />· Auburn Street <br />· Pavement Replacement Program <br />· Highway 10/Main Street Intersection <br /> <br />Consideration of Resolution Acceptin.q Bid and Authorizin.q Contract in the <br />Matter of the Western Area Phase IV Improvement of 2000 <br /> <br />COUNCILMEMBER DIETZ MOVED TO ADOPT RESOLUTION 00-82 ACCEPTING <br />BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MAI'I'ER OF THE <br />WESTERN AREA PHASE IV IMPROVEMENT OF 2000. COUNCILMEMBER <br />THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 4-0. <br /> <br />Consideration of Resolution Indicatin,q City Support for the Installation of a <br />Temporary Si.qnal at the Intersection of TH 169 and CR 33 <br /> <br />COUNCILMEMBER THOMPSON MOVED TO ADOPT RESOLUTION 00-83 <br />INDICATING CITY SUPPORT FOR THE INSTALLATION OF A TEMPORARY <br />SIGNAL SYSTEM AT THE INTERSECTION OF TRUNK HIGHWAY 169 AND <br />COUNTY ROAD 33. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE <br />MOTION CARRIED 4-0. <br /> <br />c. Main Street/Hi,qhway 169 Chan.qe Order <br /> <br />COUNCILMEMBER MOTIN MOVED TO APPROVE CHANGE ORDER # 1 <br />RELATING TO THE TEMPORARY SIGNAL AT THE MAIN STREET/HIGHWAY 169 <br />PROJECT IN AN AMOUNT OF $4,352.48 TO BE PAID BY HARDRIVES, INC. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.