My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 08-17-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
08-17-2015
>
4.5. SR 08-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:42:08 PM
Creation date
8/13/2015 3:27:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, in consideration of the mutual covenants and agreements of the <br />parties contained herein, the receipt and sufficiency of which are hereby acknowledged, the <br />parties agree as follows: <br />ARTICLE I — SCOPE OF WORK <br />1. The term "Project" as used in this agreement includes any and all work related to the <br />installation of crossing signals and activation equipment at U.S. DOT crossing 082936Y, <br />082938M, 917432K, more particularly described on Exhibit "A" and Exhibit "B" which are <br />attached hereto and incorporated herein, including, but not limited to, any and all changes to <br />telephone, telegraph, signal and electrical lines and appurtenances, installation of advance <br />warning signs and pavement marking stop bars, installation of any new crossing surface, <br />temporary and permanent track work, fencing, grading, alterations to or new construction of <br />drainage facilities, preliminary and construction engineering and contract preparation. <br />ARTICLE II — RAILROAD OBLIGATIONS <br />In consideration of the covenants of AGENCY set forth herein and the faithful <br />performance thereof, RAILROAD agrees as follows: <br />1. The RAILROAD will, using its own labor forces under applicable labor agreements, <br />install the Crossing Signal Equipment and the new crossing surface at 171St Street, 165th Avenue <br />and Jarvis Street. The work will be performed at AGENCY's expense and in accordance with the <br />MUTCD and the plans and specifications approved by AGENCY. The plans and specifications <br />are attached to this Agreement as Exhibit "B" and incorporated herein. <br />2. A detailed estimate of RAILROAD'S construction engineering, installation labor <br />(including the costs, if any, of electrical service from a public utility) and material costs required <br />for the Project are attached hereto as Exhibit "C" and incorporated herein. In the event <br />construction for the Project has not commenced within six (6) months following the effective <br />date of this Agreement, RAILROAD may, in its sole and absolute discretion, revise the cost <br />estimates set forth in said Exhibit "C". In such event, the revised cost estimates will become a <br />part of this Agreement as though originally set forth herein. Any item of work incidental to the <br />items listed on Exhibit "C" not specifically mentioned therein may be included as a part of this <br />Agreement upon written approval of AGENCY, which approval will not be unreasonably <br />withheld. <br />3. RAILROAD will furnish all labor, materials, tools and equipment for the railroad portion <br />of the work required for the construction of the Project. <br />4. The RAILROAD will, at AGENCY'S expense, dispose of all scrap from the <br />RAILROAD'S work hereunder. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.