My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 08-17-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
08-17-2015
>
4.5. SR 08-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:42:08 PM
Creation date
8/13/2015 3:27:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The RAILROAD will finalize and complete billing of all incurred costs under this <br />Agreement no later than one (1) year following installation of the Crossing Signal Equipment <br />and the new crossing surface. <br />ARTICLE III — AGENCY OBLIGATIONS <br />In consideration of the covenants of RAILROAD set forth herein and the faithful <br />performance thereof, AGENCY agrees as follows: <br />1. AGENCY must perform, at AGENCY'S expense, the following work: <br />(a) Design and Construction of 171" Street, 165th Avenue and Jarvis Street. <br />(b) Installation of a pavement marking stop bar in accordance with the Manual on <br />Uniform Traffic Control Devices (hereinafter called, "MUTCD"). <br />(c) Installation of advance warning signs in accordance with the MUTCD. <br />(d) Perform all necessary grading and paving, including backfill of excavations and <br />restoration of disturbed vegetation on BNSF's right-of-way; <br />(e) Provide suitable drainage, both temporary and permanent; <br />(f) Provide all barricades, lights, flagmen or traffic control devices as necessary, <br />during the installation of the concrete roadway and pedestrian crossing surfaces; <br />(g) Construct concrete sidewalk surface on approaches to each track, if desired; and <br />(h) Job site cleanup including removal of all construction materials, concrete debris, <br />surplus soil, refuse, contaminated soils, asphalt debris, litter and other waste <br />materials to the satisfaction of BNSF. <br />2. The AGENCY will approve the location of the signals and signal bungalow prior to <br />installation by RAILROAD. <br />3. Actual costs for engineering, materials and labor (including third party charges for the <br />installation of electrical service) associated with the installation of the Crossing Signal <br />Equipment and the new crossing surface must be paid by the AGENCY (including taxes, such as <br />applicable sales and use taxes, business and occupation taxes, and similar taxes). <br />4. In the event the services of a consultant are needed after execution of this Agreement due <br />to any exigency of the RAILROAD and the Project, the AGENCY and the RAILROAD will <br />mutually agree, in writing, as to the selection of a consultant and the applicable scope of work to <br />be performed by such consultant. All work performed hereunder by any consultant and any <br />resulting costs must be paid by AGENCY as a part of the costs for the Project. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.