My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 08-03-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
08-03-2015
>
4.3. SR 08-03-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2015 7:27:43 AM
Creation date
7/31/2015 7:24:38 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River <br /> Jackson Street Water Tower Condition Assessment July 1,2015 <br /> CDG Project#15010.00 <br /> OBSERVATIONS REFERENCE PHOTO <br /> 4. The legs are <br /> connected onto a P <br /> steel base plate at <br /> :- <br /> each footing with t <br /> steel angles,all of <br /> which appear to be f' <br /> in average <br /> , <br /> condition. <br /> vy, F <br /> 1 <br /> r ` <br /> s, <br /> e <br /> 5. The steel base plate ` <br /> at the bottom of <br /> each leg is bolted <br /> into the concrete <br /> footings. These <br /> bolts show no <br /> significant ; <br /> deterioration,and <br /> are in averag <br /> condition. <br /> 4 . 1 <br /> S <br /> 5 <br /> `COLLABORATIVE DesignGroup,inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.